MLQ.ai
About Sign in Subscribe
MLQ Infrastructure · Data Centers

Data Centers in United Kingdom

279 tracked data centers in United Kingdom representing 3.5 GW across 41 operators.

Data Centers / United Kingdom

Facilities
279
Total capacity
3.5 GW
Operators
41
Top operators in United Kingdom
Largest operational data centers in United Kingdom
Under construction / planned
Free for buyers
Find data center capacity in United Kingdom.
Tell us your power, timeline, and use case. We'll do our best to match you with the right operators in your region, free of charge.
Browse by state / region
Top cities for data centers in United Kingdom
All data centers in United Kingdom (279)
Name Operator City Power (MW) Status
Vantage CWL1-B Cardiff Vantage Data Centers Newport, Wales 148.0 verified
Vantage CWL1-C Cardiff Vantage Data Centers Newport, Wales 148.0 verified
Vantage CWL1-E Cardiff Vantage Data Centers Newport, Wales 148.0 verified
Vantage CWL1-F Cardiff Vantage Data Centers Newport, Wales 148.0 verified
Cardiff (CDF1) Vantage Newport 148.0 operational
Vantage CWL1-A Cardiff Vantage Data Centers Newport, Wales 148.0 verified
Vantage CWL1-D Cardiff Vantage Data Centers Newport, Wales 148.0 verified
CWL1 Data Center Campus Vantage Data Centers South Wales, Wales 148.0 operational
Greystoke Humber Tech Park Building 2 Greystoke South Killingholme 128.0 planned
Greystoke Humber Tech Park Building 3 Greystoke South Killingholme 128.0 planned
Greystoke Humber Tech Park Building 1 Greystoke South Killingholme 128.0 planned
London LON6 CyrusOne Iver Heath 90.0 planned
Vantage LHR1-A London Vantage Data Centers London, England 75.0 verified
Vantage LHR1-B London Vantage Data Centers London, England 75.0 verified
Vantage LHR2 London Vantage Data Centers London, England 75.0 verified
London East Global Switch London Docklands 74.0 operational
London I (LON1) Vantage North Acton 55.0 operational
Virtus London7 Enfield Virtus Data Centres Enfield 50.0 operational
Greystoke Abbots Langley Building 1 Greystoke Abbots Langley 45.0 planned
Greystoke Abbots Langley Building 2 Greystoke Abbots Langley 45.0 planned
Greystoke West London Tech Park Building 2 Greystoke Iver 45.0 planned
Greystoke West London Tech Park Building 1 Greystoke Iver 45.0 planned
Yondr London Campus Phase 3 Yondr Slough 40.0 under_construction
Virtus London4 Hayes Virtus Data Centres Hayes 36.0 verified
London South Global Switch London 35.0 operational
KAO Data KLON-04 Harlow KAO Data Harlow, England 33.4 verified
LONDON7 Stockley Park VIRTUS Data Centres Stockley Park 32.5 operational
London 1 NTT London 32.0 operational
GDC - London 1 Data Center NTT DATA, Inc. London 32.0 operational
Yondr London Campus Phase 2 Yondr Slough 30.0 operational
Yondr London Campus Phase 1 Yondr Slough 30.0 operational
Virtus London1 Virtus Data Centres London 30.0 verified
Latos Cardiff Campus DC2 Latos Data Centres Cardiff 30.0 verified
Latos Cardiff Campus DC1 Latos Data Centres Cardiff 30.0 verified
Latos Cardiff Campus DC3 Latos Data Centres Cardiff 30.0 verified
LON-2 Iron Mountain Data Centers Slough, England 27.0 operational
LONDON4 Slough VIRTUS Data Centres Slough 27.0 operational
LON-3 Iron Mountain Data Centers Slough, England 25.0 planned
LONDON9 Slough VIRTUS Data Centres Slough 24.0 operational
LONDON5 Stockley Park VIRTUS Data Centres Stockley Park 24.0 operational
Virtus London5 Stockley Park Virtus Data Centres Stockley Park 24.0 operational
Virtus London2 Virtus Data Centres London 24.0 verified
LONDON12 Slough VIRTUS Data Centres Slough 21.0 operational
GDC - Hemel Hempstead 3 NTT DATA, Inc. London 20.0 operational
London II (LON2) Vantage London 20.0 operational
Hemel Hempstead 3 NTT Hemel Hempstead 20.0 operational
Virtus London6 Virtus Data Centres London 20.0 verified
Stellanor London North Goswell Road Stellanor Datacenters London 20.0 verified
LONDON15 Saunderton VIRTUS Data Centres Saunderton 19.0 operational
LONDON17 Saunderton VIRTUS Data Centres Saunderton 19.0 operational
See all 50 data centers on this page — unlock with MLQ Infrastructure →
Previous Page 1 of 6 Next
Frequently asked questions
How many data centers are tracked in United Kingdom?
279 tracked data centers across 3 states/regions.
What is the total data center capacity in United Kingdom?
Approximately 3.5 GW across 41 operators.
What is the largest data center in United Kingdom?
The largest tracked facility is Vantage CWL1-B Cardiff, operated by Vantage Data Centers (148 MW).