Fuel Cell Data Center Deployments

Bloom Energy and other fuel-cell deployments tied to data centers, separated by filing-backed, site-backed, portfolio-backed, and pipeline evidence. 109 records tracked.

Sources: power-siting dockets, operator facility pages, utility releases, supplier disclosures

Overview

Summary & latest activity

Operational today
166 MW
Running, evidence-backed installed base.
Approved + filed
2.56 GW
Capacity in the regulatory pipeline.
Announced
4.25 GW
Press / contract stage, no permit yet.
Total capacity
6.98 GW
All stages, every tracked deployment.
States with activity
15
Distinct states with a deployment.
Records tracked
109
Evidence-backed deployment rows.
Coverage memo
The full picture — U.S. fuel cells at data centers
A sourced walkthrough of the dataset: the operational base, the forward book, suppliers, geography, the multi-state portfolios, the non-DC layer, and the methodology behind every row.
Read the coverage memo →
Recent activity
Most recent filings and announcements, newest first.
Nebius AI Factory Independence MO — 328 MW Bloom Energy Phase 1 ($2.6B 10-yr MSA)
328 MW · MO · 2026-05-20 announced · nebius.com
T5@Dulles Chantilly Fuel Cell Data Center
60 MW · VA · 2026-05-06 filed · plus.fairfaxcounty.gov
Project Jupiter — Doña Ana County NM, 2.45 GW Oracle-BorderPlex-Bloom AI Factory
2.5 GW · NM · 2026-04-27 announced · env.nm.gov
Oracle OCI U.S. AI data-center fuel-cell program — 1.2 GW contracted / up to 2.8 GW MSA
1.2 GW · Multi-state · 2026-04-13 announced · bloomenergy.com
Project Jade Cheyenne AI Factory — 900 MW Bloom SOFC Phase 1
900 MW · WY · 2026-01-06 approved · laramiecounty.legistar.com
Hedgehog Rice Power and Data Campus — 1.5 GW Bloom SOFC filing
1.5 GW · TX · 2025-12-29 filed · records.tceq.texas.gov
Full dataset

All deployments

Every tracked row — filter, sort, and export the full record.

Showing 109 of 109 deployments
Deployment Operator Supplier Capacity Stage Date Evidence Location Technology Capacity basis Behind-the-meter Customer disclosed Permits Data centers Links Source Overview
Nebius AI Factory Independence MO — 328 MW Bloom Energy Phase 1 ($2.6B 10-yr MSA) Nebius Group (NASDAQ: NBIS) Bloom Energy 328 MW announced 2026-05-20Announced Confirmed site Independence, MO solid oxide fuel cell Official Nebius/Bloom disclosure announced 328 MW of installed Bloom fuel-cell capacity planned to be operational in 2026 for Nebius AI infrastructure. Site association is supported by Nebius official Independence, Missouri AI-factory disclosures. The linked data-center row has a city project-approval filing; no fuel-cell-specific Missouri air/building/PSC filing has been linked yet. Yes Yes 1 nebius.com ↗ Nebius and Bloom Energy announced on May 20, 2026 that Bloom fuel cells will provide behind-the-meter electricity for Nebius AI infrastructure, with the first project totaling 328 MW of installed capacity expected to be operational in 2026. Nebius separately announced on May 12, 2026 that construction had started on its first US gigawatt-scale AI factory in Independence, Missouri, on approximately 400 acres in eastern Independence. MLQ links this fuel-cell deployment to the Nebius Independence AI Factory data-center row. The data-center row has a City of Independence Chapter 100/project-approval filing; no fuel-cell-specific Missouri air permit, building permit, PSC docket, or registry filing has been linked to the Bloom deployment yet.
T5@Dulles Chantilly Fuel Cell Data Center T5 Data Centers - 60 MW filed 2026-05-06Filed Confirmed filing Chantilly, VA Natural-gas fuel cell (supplier not disclosed) Fairfax County use-determination filing dated 2026-05-06 states T-5 Data Centers intends to use fuel cells to provide 60 MW of electric power for a proposed 312,000 sq ft data center; all generated energy used on-site and no grid export planned. Yes Yes 1 1 plus.fairfaxcounty.gov ↗ T5 Data Centers filed a Fairfax County use-determination request on May 6, 2026 for a proposed 312,000 sq ft data center at Stonecroft Boulevard and Lee Road in Chantilly. The filing states the project would use 60 MW of on-site natural-gas fuel cells for base load, Dominion Energy grid power for higher-load periods, and diesel generators only for emergency backup. All fuel-cell output would be consumed on-site; no grid export is planned. The supplier is not disclosed and the filing is a zoning/use determination request, so this remains a confirmed regulatory filing rather than an approved/operational deployment.
Project Jupiter — Doña Ana County NM, 2.45 GW Oracle-BorderPlex-Bloom AI Factory Oracle Cloud Infrastructure (customer); BorderPlex Digital Assets (developer); OpenAI/Stargate $500B program tenant Bloom Energy 2.5 GW announced 2026-04-27Announced Confirmed filing Santa Teresa area (Doña Ana County), NM solid oxide fuel cell Oracle/BorderPlex/Bloom announced up to 2.45 GW of Bloom fuel-cell capacity for Project Jupiter. Current filing support is NMED YGI Microgrid air-quality application 10883, received April 27, 2026; this is an application, not an issued permit or operational notice. Yes Yes 1 1 env.nm.gov ↗ Project Jupiter is a planned Oracle/BorderPlex AI data-center campus in Doña Ana County, New Mexico, near Santa Teresa. Oracle, BorderPlex, and Bloom announced on April 27, 2026 that the campus would use up to 2.45 GW of Bloom Energy solid-oxide fuel cells for on-site power. NMED public records show the earlier Acoma LLC East and West gas-microgrid applications 10732 and 10734 were withdrawn on April 27, 2026; the current fuel-cell path is represented by YGI Microgrid application 10883, received the same day. This row is filing-backed through the current NMED application, but the permit is not final or operational.
Oracle OCI U.S. AI data-center fuel-cell program — 1.2 GW contracted / up to 2.8 GW MSA non-additive Oracle Cloud Infrastructure Bloom Energy 1.2 GW contracted 2026-04-13Announced Pipeline lead - solid oxide fuel cell Bloom Energy announced on April 13, 2026 that Oracle intends to procure up to 2.8 GW of Bloom fuel-cell systems under a master services agreement; the initial 1.2 GW is contracted, deployment is underway, and deployment continues into 2027 across Oracle projects in the U.S. This is program capacity, not a site-level filing or installed-capacity row. Yes Yes bloomenergy.com ↗ Bloom and Oracle announced an expanded strategic partnership on April 13, 2026 to support Oracle AI and cloud infrastructure with Bloom solid-oxide fuel-cell systems. The master services agreement supports up to 2.8 GW, with an initial 1.2 GW contracted and deploying across U.S. Oracle projects. MLQ keeps this as a public program row because it is a primary-source, data-center-specific customer agreement, but marks it non-additive because site-level rows such as Project Jupiter should carry separate permitting/site evidence.
Project Jade Cheyenne AI Factory — 900 MW Bloom SOFC Phase 1 Project Jade / undisclosed large-load customer; Tallgrass and Black Hills continue after Crusoe exit Bloom Energy 900 MW approved 2026-01-06Approved Confirmed filing Cheyenne, WY solid oxide fuel cell 900 MW Bloom SOFC Phase 1 from Bloom Energy announcement under the original Crusoe/Tallgrass Cheyenne AI Factory structure. Laramie County filings separately approve the Project Jade data-center site plan and BFC/Cheyenne Power Hub site plan, including a fuel-cell yard. Post-Crusoe-exit Bloom transfer status is not yet publicly clarified. Yes No 2 1 laramiecounty.legistar.com ↗ Project Jade is a planned AI data-center campus in Switchgrass Industrial Park south of Cheyenne, Wyoming. Laramie County approved the Project Jade data-center site plan and the related BFC Power / Cheyenne Power Hub site plan on January 6, 2026. The county filings describe five data-center buildings and a companion power hub that includes a fuel-cell yard alongside natural-gas generation infrastructure. Bloom Energy separately announced a 900 MW solid-oxide fuel-cell Phase 1 commitment tied to the original Crusoe/Tallgrass Cheyenne AI Factory structure. The row is therefore filing-backed for the site/power-hub approval and supplier-backed for the 900 MW Bloom capacity. Status caveat: Crusoe is no longer the development partner. Black Hills stated on June 10, 2026 that the 1.8 GW Cheyenne project is still progressing with the potential large-load customer and remains targeted for service in early 2028. Tallgrass told Cowboy State Daily the project is moving forward. Bloom has not publicly clarified whether the 900 MW fuel-cell commitment transfers unchanged under the post-Crusoe structure.
Hedgehog Rice Power and Data Campus — 1.5 GW Bloom SOFC filing Hedgehog USA Bloom Energy 1.5 GW filed 2025-12-29Filed Confirmed filing Rice, TX solid oxide fuel cell TCEQ AIR NSR 182354 / Project 401574 initial application states Hedgehog proposes 4,615 Bloom Energy ES 6.5 solid oxide fuel-cell server blocks, each rated 325 eKW, to generate approximately 1,500 MW. This is proposed generation capacity, not confirmed IT critical load. Yes Yes 1 1 records.tceq.texas.gov ↗ Hedgehog USA filed a TCEQ Air Quality Standard Permit Registration on December 29, 2025 for the Hedgehog Power Generation Plant in Navarro County, Texas. The official filing proposes 4,615 Bloom Energy ES 6.5 solid oxide fuel-cell server blocks, each rated 325 eKW, for approximately 1,500 MW of on-site generation. The filing location is south of downtown Rice, Texas near NE 3270/1603 and Interstate 45. MLQ treats this as a confirmed regulatory filing for a planned fuel-cell-powered data-campus project. It is not yet an operating deployment: the TCEQ document is an initial permit registration and does not show final approval, construction completion, or commercial operation.
Brookfield / Bloom global AI-factory onsite-power partnership — $5B program non-additive Brookfield AI Infrastructure Bloom Energy - pipeline 2025-10-13Announced Pipeline lead - solid oxide fuel cell Bloom and Brookfield announced a $5B strategic partnership on October 13, 2025 for Bloom to become preferred onsite power provider for Brookfield global AI factories. No MW amount or specific site capacity was disclosed; Europe site announcement was referenced but not named in the source. Yes Yes bloomenergy.com ↗ Bloom Energy and Brookfield announced a $5B strategic AI-infrastructure partnership on October 13, 2025. Bloom is described as Brookfield preferred onsite power provider for global AI factories, and the release says the companies are collaborating on AI factories globally, including a Europe site expected to be announced later. MLQ keeps this as a pipeline lead because it is data-center/AI-factory-specific and primary-source, but it is not a site row and has no disclosed MW capacity.
AWS Hilliard / Scioto Darby Creek — 72.9 MW Bloom fuel-cell system Amazon Web Services / Amazon Data Services Bloom Energy 73 MW approved 2025-09-22Approved Confirmed filing Hilliard, OH solid oxide fuel cell OPSB/AEP records state 72.9 MW from 228 Bloom Energy Servers for AWS load at the Scioto Darby Creek campus. Ohio EPA PTIO issued October 2025 and appealed by Hilliard; construction is planned for early fall 2026 through early fall 2027. Not operational yet. Yes Yes 2 1 hilliardohio.gov ↗ Amazon Web Services is partnering with AEP Ohio on a behind-the-meter 73 MW Bloom Energy fuel cell facility (228 Energy Servers) to power AWS data center load on a 142-acre campus on Scioto Darby Creek Road, Hilliard, Ohio. The Ohio Power Siting Board approved the siting via case 25-0649-EL-BLN on Sept 22, 2025. The Ohio EPA issued a separate Permit to Install and Operate (PTIO) in October 2025. The City of Hilliard appealed the EPA permit on November 7, 2025 (Environmental Review Appeals Commission case 25-7227), arguing the EPA failed to notify the local government before issuing the permit. The permit allows up to 1.45 million pounds of CO2 per day (≈66,000 gasoline-vehicle equivalent). Construction is planned to start in early fall 2026 and continue through early fall 2027 — the facility is NOT yet operational. A separate, parallel Ohio EPA review concerns 158 diesel backup generators at the same site.
AEP Ohio AWS + Cologix onsite fuel-cell portfolio non-additive Amazon Web Services; Cologix Bloom Energy - approved 2025-05-28Approved Confirmed portfolio Central Ohio, OH solid oxide fuel cell Portfolio capacity is not disclosed by AEP. The AWS Hilliard child row carries the known 72.9 MW site-level capacity; the Cologix AEC child row has no public MW disclosure. Yes Yes 4 pr.aep.com ↗ Portfolio summary for AEP Ohio's first Bloom Energy onsite fuel-cell projects serving AWS and Cologix data-center customers. The row is useful as the AEP-level program context, but it is non-additive: AWS Hilliard and the Cologix AEC companion rows carry the filing-level evidence. MLQ does not allocate extra MW to this portfolio row.
AEP Ohio / AWS fuel-cell supply agreement — PUCO 25-0133-EL-AEC Amazon Web Services Bloom Energy - approved 2025-05-28Approved Confirmed filing OH solid oxide fuel cell Supply-agreement docket for AEP Ohio and AWS. Capacity is not disclosed in the AEC row; the companion Hilliard siting/PTIO records support the 72.9 MW AWS Scioto Darby Creek fuel-cell system. Yes Yes 1 1 aep.com ↗ PUCO case 25-0133-EL-AEC: an Application for Energy Contract (EL-AEC) between AEP Ohio and Amazon Web Services, filed February 2025 and approved by PUCO in May 2025. The case authorizes AEP Ohio to install onsite Bloom Energy fuel cells at an AWS data center under a customer-specific supply agreement. This is the first PUCO-approved AEC for FC supply and is a companion case to the AWS Hilliard siting case (25-0649-EL-BLN). Specific capacity and site address are not disclosed in the AEC filing (those are in the separate OPSB siting case for Hilliard). Note: Ohio HB 15 (passed 2025) generally prohibits utilities from providing behind-the-meter electric generation service starting March 31, 2025 — this case grandfathered in because the application was filed before the cutoff. Future AEP-supplied BTM FC projects in Ohio are now blocked by HB 15.
AEP Ohio / Cologix onsite fuel-cell supply agreement non-additive Cologix Bloom Energy - approved 2025-05-28Approved Confirmed filing Central Ohio, OH solid oxide fuel cell Capacity not disclosed in the public AEP/PUCO materials. Treat as a non-additive companion filing until a Cologix site-level fuel-cell case or construction record is matched. Yes Yes 1 aep.com ↗ PUCO case 25-0134-EL-AEC is the Cologix companion customer-specific supply-agreement approval for AEP Ohio onsite fuel-cell service. AEP identifies the customer as Cologix and the technology partner as Bloom Energy, but the public materials reviewed do not disclose the exact Cologix site or the fuel-cell capacity. MLQ keeps this as a confirmed filing row and marks it non-additive so it is not counted as site-level MW.
Diversified Energy / FuelCell Energy / TESIAC — 360 MW Appalachia data-center power pipeline Future data-center customers not disclosed FuelCell Energy 360 MW announced 2025-03-10Announced Pipeline lead - molten carbonate fuel cell (FuelCell Energy SureSource platform — methane-to-hydrogen-to-electricity) Pipeline aggregate only. Diversified Energy, FuelCell Energy, and TESIAC announced up to 360 MW for three future off-grid data-center power locations across Virginia, West Virginia, and Kentucky. Specific sites/customers are not yet publicly disclosed. Yes No ir.div.energy ↗
Equinix US IBX Bloom portfolio — 100+ MW across 19 data centers Equinix Bloom Energy 100 MW operationalunder construction 2025-02-20Announced Confirmed portfolio - solid oxide fuel cell Confirmed portfolio aggregate. Bloom announced on February 20, 2025 that its Equinix collaboration exceeded 100 MW across 19 US IBX data centers in six states, with about 75 MW operational and another 30 MW under construction. This is not allocated to individual site rows. Yes investor.bloomenergy.com ↗ Bloom Energy announced on February 20, 2025 that its fuel-cell collaboration with Equinix had surpassed 100 MW across 19 Equinix IBX data centers in six US states, with roughly 75 MW operational and another 30 MW under construction. The deployment uses Bloom solid-oxide fuel cells for on-site, behind-the-meter power at colocation facilities. MLQ keeps this as a confirmed_portfolio aggregate: the 100+ MW is not allocated to individual site rows, and the linked Equinix IBX data centers identify participating campuses rather than per-site capacity.
Equinix DC21 Ashburn — Bloom fuel-cell systems Equinix Bloom Energy - operational 2025-02-20Announced Confirmed site Ashburn, VA solid oxide fuel cell Equinix's sustainability site confirms fuel-cell systems at DC21 provide resilient, low-emissions power. Per-site MW is not publicly disclosed; DC21 is part of the broader Equinix/Bloom portfolio context that exceeded 100 MW across 19 US IBX data centers. Yes Yes 1 sustainability.equinix.com ↗ Equinix confirms Bloom Energy fuel-cell systems provide on-site power at its DC21 data center in Ashburn, Virginia. The deployment is part of the broader Equinix/Bloom collaboration that surpassed 100 MW across 19 US IBX data centers, announced February 20, 2025. Per-site capacity at DC21 is not publicly disclosed, so this row is kept at the site level with capacity null and is not allocated any portion of the 100+ MW portfolio total.
FCEL Hartford 7.4 MW utility fuel-cell project non-DC Eversource / United Illuminating utility offtake FuelCell Energy - non dc grid generation 2025-01-22Announced Candidate Hartford, CT molten carbonate fuel cell 7.4 MW utility/grid project per FCEL announcement; not counted in MLQ public data-center fuel-cell deployment capacity. No Yes investor.fce.com ↗
HyAxiom Bridgeport 9.6 MW CHP fuel-cell project non-DC No disclosed data-center customer HyAxiom - non dc grid generation 2025-01-01Announced Candidate Bridgeport, CT phosphoric acid fuel cell (PureCell M400) — multi-story CHP configuration 9.6 MW CHP fuel-cell project; not counted in public data-center fuel-cell deployment capacity. Yes No enkiai.com ↗
AEP / Bloom 1 GW AI data-center fuel-cell procurement program non-additive AEP data-center customers not fully disclosed Bloom Energy 1.0 GW pipeline 2024-11-14Announced Pipeline lead - solid oxide fuel cell Up to 1 GW procurement agreement with initial 100 MW order per Bloom/AEP announcement. This is program capacity, not site-level installed capacity. Yes No investor.bloomenergy.com ↗ AEP and Bloom announced a procurement agreement for up to 1 GW of Bloom fuel cells to power AI data centers, with an initial 100 MW order. MLQ keeps this public because it is data-center-specific and useful program context, but marks it non-additive: AWS Hilliard, AWS AEC, Cologix AEC, and future named sites carry the site/docket evidence.
Quanta Computer Fremont AI-hardware manufacturing microgrid expansion non-DC Quanta Computer Bloom Energy - non dc manufacturing 2024-11-07Announced Confirmed site Fremont, CA solid oxide fuel cell Bloom announced on November 7, 2024 that Quanta expanded an existing Bloom SOFC installation by more than 150% to power production of critical AI hardware in Fremont, California. Bloom did not disclose total MW in the release. This is manufacturing / AI supply-chain activity, not a data-center deployment. Yes Yes bloomenergy.com ↗ Bloom Energy and Quanta Computer announced an expansion of Quanta Fremont manufacturing-site fuel-cell power on November 7, 2024. The installation supports production of critical AI hardware serving the AI industry and avoids utility interconnection delays at Quanta manufacturing operations. MLQ tracks this as non-DC fuel-cell activity because it is directly AI-infrastructure-adjacent, but the powered load is manufacturing, not a data center.
Generate Capital + Bloom Energy 45 MW fuel cell server portfolios (CT + NJ, 20 MW IFTM + 25 MW BTM) non-DC Multiple commercial customers (sites not publicly disclosed) Bloom Energy - non dc specific portfolio 2024-10-21Announced Candidate - solid oxide fuel cell 45 MW combined Bloom Energy fuel-cell server portfolios split between a 20 MW in-front-of-the-meter grid-feed asset and a 25 MW behind-the-meter commercial portfolio in Connecticut/New Jersey. Source was published 2024-10-21 and does not disclose data-center customers or site-level deployments. Yes No wholesale.banking.societegenerale.com ↗ Generate Capital + Bloom 45 MW CT+NJ Northeast portfolio, announced 2024-10-21. Source describes 20 MW grid-feed plus 25 MW BTM commercial portfolio, but does not disclose data-center customers or sites.
Spring Valley Technology Park — proposed hydrogen fuel-cell microgrid Active Infrastructure - - pre application 2024-10-01Pre-application Pipeline lead Leesburg, VA Hydrogen fuel-cell microgrid (natural gas / 'blue hydrogen' initially) No public MW disclosure. Public reporting supports the data-center campus size and proposed onsite hydrogen fuel-cell microgrid concept, not a permitted/approved fuel-cell capacity. Yes Yes 1 datacenterdynamics.com ↗ Spring Valley Technology Park is a proposed Active Infrastructure data-center campus south of Leesburg, Virginia. Public reporting supports a 362-acre / 3.5M sqft campus with proposed onsite natural-gas-powered hydrogen fuel cells and battery storage. MLQ treats this as a pipeline lead, not a confirmed deployment: the project still needs land-use approvals, and no MW, fuel-cell supplier, tenant, permit, or operating date has been disclosed.
ECL TerraSite-TX1 — 1 GW off-grid hydrogen AI factory ECL; first tenant Lambda - 1.0 GW announced 2024-09-25Announced Confirmed site Houston, TX hydrogen fuel cells ECL announced 1 GW full buildout, expandable to 2 GW, with a first 50 MW module targeted for summer 2025. Capacity is announced site buildout capacity, not an operating or permitted MW figure. Yes Yes 1 businesswire.com ↗ ECL TerraSite-TX1 is an announced off-grid hydrogen-powered AI factory data center east of Houston. ECL disclosed 1 GW planned capacity, optional expansion to 2 GW, a first 50 MW module target, and Lambda as first tenant. MLQ treats it as a confirmed site announcement because the operator names the project, tenant, location region, and hydrogen fuel-cell power design. The fuel-cell vendor is not public, so MLQ does not label it as Plug/Bloom/FCEL-specific.
CoreWeave / Chirisa Volo, IL — Bloom SOFC deployment CoreWeave (facility owned by Chirisa Technology Parks) Bloom Energy 14 MW announced 2024-07-16Announced Confirmed site Volo, IL solid oxide fuel cell Bloom confirms on-site Bloom fuel cells for CoreWeave at Chirisa Technology Parks' Volo, Illinois data center with Q3 2025 commissioning target. 14 MW is the Volo YLO-01 facility power figure from data-center reporting/CTP context; Bloom did not separately disclose fuel-cell MW. Yes Yes 1 bloomenergy.com ↗ Bloom Energy and CoreWeave announced in July 2024 a partnership to deploy on-site Bloom solid-oxide fuel cells at a CoreWeave AI data center at Chirisa Technology Parks Volo, Illinois campus (YLO-01), with a Q3 2025 commissioning target. MLQ treats this as a confirmed site announcement: the operator, supplier (Bloom), and site are named. The 14 MW figure reflects the Volo facility power capacity from data-center reporting; Bloom did not separately disclose the fuel-cell sizing, and no independent operating date is confirmed.
Intel Santa Clara HPC data center — Bloom fuel-cell expansion Intel Bloom Energy - announced 2024-05-09Announced Confirmed site Santa Clara, CA solid oxide fuel cell Bloom announced additional MW at Intel Santa Clara but did not disclose the incremental or total site fuel-cell capacity. Capacity remains null until a filing or operator disclosure gives MW. Yes 1 investor.bloomenergy.com ↗ Bloom and Intel announced a power-capacity agreement for additional Bloom Energy Servers at Intel's existing Santa Clara high-performance computing data center. The release says Bloom fuel cells have been deployed at the location since 2014 and that the 2024 agreement expands capacity. MLQ treats this as a confirmed site row but keeps capacity null because the public release does not disclose the MW.
University of Hartford HyAxiom fuel-cell campus installation non-DC No disclosed data-center customer HyAxiom - non dc campus energy 2024-05-01Announced Candidate West Hartford, CT phosphoric acid fuel cell (PureCell M400 ×4) 1.8 MW campus fuel-cell installation; not counted in public data-center fuel-cell deployment capacity. Yes Yes hartford.edu ↗
Texas Advanced Computing Center — 100 kW PEM hydrogen fuel cell Texas Advanced Computing Center / University of Texas at Austin PowerCell Sweden 0 MW operational 2024-04-01Operational Confirmed site Austin, TX PEM hydrogen fuel cell 100 kW PowerCell Sweden MS-100 PEM fuel-cell system. TACC load is approximately 6-9 MW, so the fuel cell is supplemental demonstration power, not primary data-center supply. Yes Yes 1 news.cision.com ↗ Texas Advanced Computing Center operates a 100 kW PowerCell Sweden PEM hydrogen fuel-cell system at UT Austin's J.J. Pickle Research Campus as part of the DOE H2@Scale demonstration. MLQ keeps it public because TACC is a real supercomputing/data-center facility, but the row is intentionally labeled as a small operational demonstration, not a commercial-scale AI data-center power deployment.
FCEL Derby 14 MW fuel-cell park non-DC No disclosed data-center customer FuelCell Energy - non dc grid generation 2023-11-16commercial_operation Candidate Derby, CT molten carbonate fuel cell (10 fuel cells) 14 MW grid-supply fuel-cell park; not counted in public data-center fuel-cell deployment capacity. No Yes investor.fce.com ↗ FCEL Derby 14 MW Fuel Cell Park, operational Nov 16 2023. 2nd largest US FC park. 10 fuel cells. Eversource + UI 20-yr PPAs.
Connecticut Data Park Colchester — 18 MW Bloom fuel-cell facility ReNew Developers / Connecticut Data Park Bloom Energy 18 MW approved 2023-11-09Approved Confirmed filing Colchester, CT solid oxide fuel cell CT Siting Council Petition 1533A materials support 18 MW of natural-gas behind-the-meter Bloom fuel-cell capacity serving a planned 146,000 sqft data center. Yes Yes 1 1 portal.ct.gov ↗ Connecticut Siting Council Petition 1533A describes an 18 MW behind-the-meter Bloom Energy fuel-cell facility configured as a microgrid for a second Colchester data center. MLQ links this to the Connecticut Data Park Colchester data-center record and treats it as approved, not operational.
Cablevision White Plains NOC — 1.5 MW Bloom fuel cell Cablevision / Altice USA Bloom Energy 2 MW operational 2023-07-14Reporting start Confirmed filing White Plains, NY solid oxide fuel cell NYSERDA DER Facility ID 3160 reports 1,500 kW Bloom Energy fuel-cell capacity with reporting start date 2023-07-14 and reporting end date 2025-12-31. Yes Yes 1 1 der.nyserda.ny.gov ↗ NYSERDA DER Facility 3160 is a filing-backed Bloom Energy fuel-cell record for Cablevision White Plains. MLQ includes it because telecom network operations centers and cable headends are data-center-adjacent critical infrastructure, but labels it clearly as telecom/NOC rather than hyperscale colocation or cloud data center.
Stamford Health Tully Center Bloom fuel-cell installation non-DC No disclosed data-center customer Bloom Energy - non dc healthcare energy 2023-03-21Announced Candidate Stamford, CT solid oxide fuel cell 700 kW healthcare-campus installation; not counted in public data-center fuel-cell deployment capacity. Yes Yes bloomenergy.com ↗
Stamford Hospital Bloom fuel-cell campus installation non-DC No disclosed data-center customer Bloom Energy - non dc healthcare energy 2023-03-21Announced Candidate Stamford, CT solid oxide fuel cell 2 MW hospital reliability installation; not counted in public data-center fuel-cell deployment capacity. Yes Yes bloomenergy.com ↗
FCEL Groton Submarine Base 7.4 MW fuel-cell park non-DC No disclosed data-center customer FuelCell Energy - non dc military grid generation 2022-12-16commercial_operation Candidate Groton, CT molten carbonate fuel cell (SureSource) 7.4 MW military/utility microgrid fuel-cell park; not counted in public data-center fuel-cell deployment capacity. No Yes portal.ct.gov ↗ FCEL Groton Sub Base 7.4 MW FC park, commercial op Dec 16 2022. CMEEC offtaker via 20-yr PPA. US Navy Submarine Base New London microgrid reliability.
Bristol Technology Center — 4 MW Bloom fuel-cell data-center project ReNew Riverside / Bristol Technology Center Bloom Energy 4 MW approved 2022-12-08Approved Confirmed filing Bristol, CT solid oxide fuel cell CT Siting Council Petition 1540 supports 4.0 MW customer-side Bloom fuel-cell capacity for the Bristol Technology Center data-center project; city materials identify the 27,000 sqft data-center context. Yes Yes 1 1 portal.ct.gov ↗ Connecticut Siting Council Petition 1540 is a filing-backed data-center fuel-cell record. The petition covers a 4 MW customer-side Bloom Energy fuel-cell facility at 234 Riverside Avenue tied to the Bristol Technology Center data-center project. MLQ treats it as approved, not operational, and links the facility to a Bristol Technology Center data-center record.
UConn Storrs Depot Campus HyAxiom fuel-cell installation non-DC No disclosed data-center customer HyAxiom (Doosan subsidiary) - non dc campus energy 2022-11-01Operational Candidate Storrs, CT phosphoric acid fuel cell (PureCell M400) 460 kW campus research-lab / CHP fuel-cell installation; not counted in public data-center fuel-cell deployment capacity. Yes Yes today.uconn.edu ↗
Connecticut Data Park Colchester — 4.99 MW Bloom fuel-cell facility ReNew Developers / Connecticut Data Park Bloom Energy 5 MW approved 2022-10-13Approved Confirmed filing Colchester, CT solid oxide fuel cell CT Siting Council Petition 1533 and staff report support 4.99 MW Bloom Energy fuel-cell capacity at 42 Old Amston Road serving about 99% of the planned data-center base load. Yes Yes 1 1 portal.ct.gov ↗ Connecticut Siting Council Petition 1533 is a filing-backed data-center fuel-cell record. The petition covers a 4.99 MW behind-the-meter Bloom Energy fuel-cell facility at 42 Old Amston Road serving the first Colchester Data Park phase. Petition 1533A is the later/second Colchester facility row. MLQ treats this row as approved, not operational.
FCEL Beacon Falls Energy Park 63.3 MW fuel-cell park non-DC No disclosed data-center customer FuelCell Energy - non dc grid generation 2022-08-01permitted Candidate Beacon Falls, CT molten carbonate fuel cell 63.3 MW grid fuel-cell park; not counted in public data-center fuel-cell deployment capacity. No Yes alternativeenergyhq.com ↗
Apple Staten Island - Winant Place — 5 MW Bloom fuel cell Apple Inc Bloom Energy 5 MW operational 2022-08-01Operating since Confirmed filing Staten Island, NY solid oxide fuel cell EIA-860 / GridInfo support 5 MW Bloom SOFC capacity at 100 Winant Place, operational since August 2022. Companion Industrial Loop record brings the registry-backed Apple Staten Island total to 10 MW. Yes Yes 1 1 gridinfo.com ↗ Federal EIA-860 data and GridInfo identify a 5 MW Bloom Energy solid-oxide fuel-cell plant named Apple Staten Island - Winant Place. MLQ keeps the row public because the source is an official federal generator registry mirrored by GridInfo, but caveats the data-center attribution: Apple does not publicly list Staten Island among its named data centers in environmental reports.
Microsoft Cheyenne data center — 1.5 MW Ballard hydrogen backup demo Microsoft Ballard Power Systems 2 MW demonstrated 2022-07-01Demonstrated Confirmed site Cheyenne, WY PEM hydrogen fuel cell backup system Ballard/Caterpillar/Microsoft sources support a 1.5 MW PEM hydrogen fuel-cell backup demonstration with battery storage, including a 48-hour simulated outage on real data-center load. This is backup demonstration capacity, not primary power. Yes Yes 4 ballard.com ↗ Microsoft, Caterpillar, and Ballard demonstrated a 1.5 MW hydrogen fuel-cell backup generator system at a Microsoft Cheyenne, Wyoming data center. The row ID preserves an earlier Quincy-WA misclassification for audit continuity, but all public copy now uses Cheyenne. MLQ treats this as a confirmed site demonstration, not a commercial primary-power deployment.
Apple Staten Island - Industrial Loop — 5 MW Bloom fuel cell Apple Inc Bloom Energy 5 MW operational 2022-06-01Operating since Confirmed filing Staten Island, NY solid oxide fuel cell EIA-860 / GridInfo support 5 MW Bloom SOFC capacity at 28 Industrial Loop, operational since June 2022. Companion Winant Place record brings the registry-backed Apple Staten Island total to 10 MW. Yes Yes 1 1 gridinfo.com ↗ Federal EIA-860 data and GridInfo identify a 5 MW Bloom Energy solid-oxide fuel-cell plant named Apple Staten Island - Industrial Loop. MLQ keeps the row public because the source is an official federal generator registry mirrored by GridInfo, but caveats the data-center attribution: Apple does not publicly list Staten Island among its named data centers in environmental reports.
Energy & Innovation Park New Britain — 19.98 MW Bloom fuel-cell project Energy & Innovation Park / Generate NB Fuel Cells Bloom Energy 20 MW construction complete 2021-12-21Approved Confirmed filing New Britain, CT solid oxide fuel cell CHP CT Siting Council Petition 1350A supports 19.98 MW at 480 Myrtle Street; construction completion notice recorded 2024-06-18. Treated as filing-backed data-center/energy-campus infrastructure. Yes Yes 1 1 portal.ct.gov ↗ Connecticut Siting Council Petition 1350A is a filing-backed fuel-cell record for Energy & Innovation Park New Britain. The project is a 19.98 MW Bloom CHP fuel-cell facility at 480 Myrtle Street, with the CSC page recording construction completion notice on June 18, 2024. MLQ keeps it public because the petition is tied to the Energy & Innovation Park data-center/energy-campus project scope, but labels it as construction-complete rather than simply operational.
Equinix DC15 Ashburn — Bloom fuel cells at Co-Innovation Facility Equinix Bloom Energy - operational 2021-11-01Operating since Confirmed site Ashburn, VA solid oxide fuel cell Named-site confirmation for Equinix DC15, but no public per-site MW disclosure. Capacity remains null; Equinix portfolio MW is tracked separately. Yes Yes 1 datacenterfrontier.com ↗ Equinix DC15 in Ashburn hosted Bloom Energy fuel cells in the Co-Innovation Facility test environment. MLQ treats this as a confirmed named-site deployment, but does not allocate MW because the source does not disclose DC15-specific fuel-cell capacity.
Equinix SV11 San Jose — 20 MW Bloom primary-power fuel cells Equinix Bloom Energy 20 MW operational 2021-06-30Operating since Confirmed site San Jose, CA solid oxide fuel cell Public reporting around SV11 opening supports 20 MW Bloom fuel-cell primary-power context for the Silicon Valley facility/campus. CARB DG-058 is a product certification link, not a site-specific 20 MW permit. Yes Yes 1 1 hydrogen-central.com ↗ Equinix SV11 is a named San Jose IBX where public reporting described Bloom Energy fuel cells as primary onsite power. MLQ keeps the 20 MW figure because it is explicitly reported with the SV11/Silicon Valley opening context, while caveating that the linked CARB DG-058 record is a Bloom product certification rather than a site-specific permit.
SGIP Mountain View data-processing Bloom installation — 200 kW Undisclosed data-processing / hosting customer Bloom Energy 0 MW operational 2021-04-14Operating since Confirmed filing Mountain View, CA solid oxide fuel cell CPUC SGIP record PGE-SGIP-2019-9812 supports 200 kW Bloom Energy Server capacity, NAICS 518210, payment completed, interconnection date 2021-04-14. Yes No 1 selfgenca.com ↗ CPUC SGIP record PGE-SGIP-2019-9812 is a 200 kW Bloom Energy Server installation in Mountain View with NAICS 518210 data processing/hosting. SGIP masks the host customer and exact address, so MLQ keeps the row as filing-backed but does not link a facility record.
Caltech research-compute microgrid — 4.2 MW Bloom fuel cells Caltech Bloom Energy 4 MW operational 2021-01-01Announced Confirmed portfolio Pasadena, CA solid oxide fuel cell Bloom Caltech case study supports 4.2 MW across five campus sites. Capacity is campus microgrid portfolio capacity, not one data-center building capacity. Yes Yes 1 bloomenergy.com ↗ Caltech operates a Bloom Energy microgrid across five campus sites totaling 4.2 MW. MLQ keeps this row because the source ties the microgrid to research-compute/HPC campus load, but classifies it as research-compute/campus infrastructure rather than a commercial data-center deployment.
Altice Hicksville data-center campus — 2 MW Bloom fuel cell Altice USA Bloom Energy 2 MW operational 2021-01-01Operating since Confirmed filing Hicksville, NY solid oxide fuel cell EIA-860 federal generator inventory supports 2.0 MW Bloom fuel-cell capacity for plant Altice - Hicksville, operating year 2021. Yes 1 1 eia.gov ↗ EIA-860 records a 2 MW Bloom fuel-cell generator at Altice Hicksville. MLQ keeps it public under the telecom/NOC/data-center-campus inclusion rule, with explicit labeling that this is network/data-center infrastructure rather than hyperscale cloud or colocation.
Equinix BO2 Billerica — 1.9 MW Bloom fuel cell Equinix Bloom Energy 2 MW operational 2021-01-01Operating (EIA-860) Confirmed filing Billerica, MA solid oxide fuel cell EIA-860 federal generator inventory supports 1.9 MW Bloom fuel-cell capacity at Equinix Billerica, operating year 2021. Yes Yes 1 1 eia.gov ↗ EIA-860 records a 1.9 MW Bloom fuel-cell generator at Equinix Billerica / BO2 in Massachusetts, operating year 2021. MLQ keeps the row as confirmed filing-backed infrastructure and links it to Equinix BO2. The BO2/Boston naming is a market label; the physical site is Billerica/Pinehurst in Middlesex County.
Comcast Universal City cable headend — 1 MW Bloom fuel cell Comcast Bloom Energy 1 MW operational 2021-01-01Operating since Confirmed filing Universal City, CA solid oxide fuel cell EIA-860 federal generator inventory supports 1.0 MW Bloom SOFC capacity at Comcast Universal City, operating year 2021. Yes Yes 1 1 eia.gov ↗ EIA-860 records a 1 MW Bloom fuel-cell generator at Comcast Universal City. MLQ includes the row under the telecom/cable-headend infrastructure rule and labels it separately from cloud or colocation data centers.
One World Trade Center — Bloom Energy 1.2 MW SOFC non-DC Port Authority of New York and New Jersey (tenant: WTC commercial) Bloom Energy - non dc commercial building 2020-12-11Announced Candidate New York, NY solid oxide fuel cell 1.2 MW source capacity retained internally; not counted in public data-center fuel-cell deployment capacity. Yes Yes panynj.gov ↗ One World Trade Center 1.2 MW Bloom Energy SOFC — the first INDOOR all-electric fuel cell technology installation globally, on rooftop setback eight floors above Times Square. Port Authority of NY/NJ partnership with Bloom Energy announced Dec 11 2020. Commercial operation 2021. Powers 1/3 of One WTC electrical demand and 8% at peak. Reduces local air pollution 99% and eliminates 1,140 metric tons CO2/yr. Customer-owned financing model.
LIPA FIT IV Yaphank Fuel Cell Park (Brookhaven Landfill) — FCEL 7.4 MW non-DC PSEG Long Island / LIPA (grid-feed; no customer tenant) FuelCell Energy (FCEL) - non dc grid generation 2020-12-01commercial_operation Candidate Yaphank, NY molten carbonate fuel cell (SureSource 3000 ×3) 7.4 MW source capacity retained internally; not counted in public data-center fuel-cell deployment capacity. No Yes hydrogen-central.com ↗ LIPA FIT IV LIPA1 = 7.4 MW FuelCell Energy SureSource 3000 carbonate FC park at Brookhaven Landfill, Yaphank Long Island NY. Operational. Grid-feed under PSEG Long Island PPA. Only surviving LIPA FIT IV project (LIPA 2 + 3 cancelled 2023).
FCEL Triangle Street Danbury — SureSource 4000 (first deployment) non-DC FuelCell Energy (grid-feed) FuelCell Energy - non dc grid generation 2020-04-21commercial_operation Candidate Danbury, CT molten carbonate fuel cell (SureSource 4000 — first deployment of high-electrical-efficiency platform) 7.4 MW source capacity retained internally; not counted in public data-center fuel-cell deployment capacity. No Yes s21.q4cdn.com ↗ FCEL Triangle Street Danbury SureSource 4000 first deployment, commercial op April 21 2020. ~7.4 MW. High-electrical-efficiency platform.
Stop & Shop — 40-store Bloom Energy AlwaysON Microgrid portfolio (MA + NY, 10 MW combined) non-DC Stop & Shop Supermarket Company LLC (Ahold Delhaize USA subsidiary) Bloom Energy - non dc retail portfolio 2020-01-14Announced Candidate - solid oxide fuel cell (Bloom Energy Server in AlwaysON Microgrid configuration) 10 MW source capacity retained internally; not counted in public data-center fuel-cell deployment capacity. Yes Yes bloomenergy.com ↗ Stop & Shop 40-store Bloom AlwaysON Microgrid portfolio. 10 MW MA+NY. Announced Jan 14 2020.
Altice Bethpage network campus — 2 MW Bloom fuel cell Altice USA Bloom Energy 2 MW operational 2020-01-01Operating since Confirmed filing Bethpage, NY solid oxide fuel cell EIA-860 federal generator inventory supports 2.0 MW Bloom fuel-cell capacity for Bloom-Altice Fuel Cell, operating year 2020. Site resolved to Altice USA HQ / network campus at 1111 Stewart Avenue, Bethpage. Yes 1 1 eia.gov ↗ EIA-860 records a 2 MW Bloom fuel-cell generator for Bloom-Altice Fuel Cell, resolved to Altice USA HQ / network campus in Bethpage. MLQ keeps it public under the telecom/network infrastructure rule, separate from Altice Hicksville.
Equinix Elmsford IBX — 1.7 MW Bloom fuel cell Equinix Bloom Energy 2 MW operational 2020-01-01Operating since Confirmed filing Elmsford, NY solid oxide fuel cell NYSERDA DER Facility ID 1879 and EIA-860 support 1.7 MW Bloom fuel-cell capacity at Equinix Elmsford, operating year 2020. Yes Yes 1 1 der.nyserda.ny.gov ↗ NYSERDA DER Facility 1879 and EIA-860 identify a Bloom Energy fuel-cell installation at Equinix Elmsford. MLQ treats it as a filing-backed data-center row and links it to an Equinix Elmsford facility record.
Duke Energy + Bloom Energy 37 MW commercial+industrial BTM portfolio (CA + CT + MD + NY) non-DC Multiple commercial+industrial customers (specific sites not publicly disclosed) Bloom Energy - non dc specific portfolio 2019-07-01Announced Candidate - solid oxide fuel cell 37 MW source capacity retained internally; not counted in public data-center fuel-cell deployment capacity. Yes No news.duke-energy.com ↗
Extreme Networks San Jose HQ — Bloom Energy microgrid non-DC Extreme Networks Bloom Energy - non dc corporate hq 2019-03-01Announced Candidate San Jose, CA solid oxide fuel cell Source capacity retained internally; not counted in public data-center fuel-cell deployment capacity. Yes Yes microgridknowledge.com ↗ Extreme Networks San Jose CA HQ Bloom microgrid, Q1 2019 announcement. Triggered by 3 utility outages summer 2018.
II-VI Incorporated Warren NJ manufacturing facility — Bloom Energy 2.5 MW microgrid non-DC II-VI Incorporated (now part of Coherent Corp after 2022 merger) Bloom Energy - non dc manufacturing 2019-03-01Announced Candidate Warren, NJ solid oxide fuel cell 2.5 MW source capacity retained internally; not counted in public data-center fuel-cell deployment capacity. Yes Yes bloomenergy.com ↗ II-VI Warren NJ 2.5 MW Bloom microgrid, operational Q1 2019. Photonic/electronic materials manufacturing. Now Coherent Corp (post-2022 merger).
AT&T North Watney central office — 2 MW Bloom fuel cell AT&T Bloom Energy 2 MW operational 2019-01-01Operating since Confirmed filing Solano County, CA solid oxide fuel cell EIA-860 federal generator inventory supports 2.0 MW Bloom fuel-cell capacity at AT&T North Watney, operating year 2019. Yes Yes 1 1 eia.gov ↗ EIA-860 records a 2 MW Bloom fuel-cell generator at AT&T North Watney in Solano County. MLQ includes the row under the telecom central-office / network-infrastructure rule and links a facility record for the AT&T site.
AT&T Ventura Boulevard central office — 1 MW Bloom fuel cell AT&T Bloom Energy 1 MW operational 2019-01-01Operating since Confirmed filing Los Angeles, CA solid oxide fuel cell EIA-860 federal generator inventory supports 1.0 MW Bloom fuel-cell capacity at AT&T Ventura Blvd, operating year 2019. Yes Yes 1 1 eia.gov ↗ EIA-860 records a 1 MW Bloom fuel-cell generator at AT&T Ventura Boulevard. MLQ includes the row under the telecom central-office / network-infrastructure rule and links a facility record for the AT&T site.
Mass General Brigham Marlborough Data Center — Bloom fuel-cell deployment Mass General Brigham Bloom Energy - operational 2018-11-29PPA announced Confirmed site Marlborough, MA solid oxide fuel cell Aggregate 4.1 MW Bloom deployment across multiple Partners HealthCare sites under 15-year PPA; Marlborough data-center share is not disclosed, so capacity remains null. Yes Yes 1 bloomenergy.com ↗ Partners HealthCare, now Mass General Brigham, deployed Bloom fuel cells across multiple Massachusetts sites under a 15-year PPA. MLQ keeps the Marlborough row public because the Marlborough site is the data-center facility within that portfolio. The 4.1 MW total is not allocated to Marlborough because per-site MW is not public.
CoreSite BO1 Somerville — 3.6 MW Bloom fuel-cell system CoreSite / American Tower Bloom Energy 4 MW operational 2018-06-20Permit filed Confirmed site Somerville, MA solid oxide fuel cell 3.6 MW Bloom SOFC at CoreSite BO1 / 70 Inner Belt Road, supported by CoreSite disclosure, Somerville ZBA filing, and EIA context. Yes Yes 1 1 coresite.com ↗ CoreSite BO1 in Somerville, Massachusetts uses a hybrid utility + Bloom fuel-cell power architecture. MLQ links the row to the canonical CoreSite BO1 facility and keeps the 3.6 MW figure based on CoreSite/EIA/local filing context.
Stop & Shop Peekskill NY — Bloom Energy (precursor pilot pre-2020) non-DC Stop & Shop Supermarket Company (Ahold Delhaize) Bloom Energy - non dc retail site 2018-01-01Operational Candidate Peekskill, NY solid oxide fuel cell Source capacity retained internally; not counted in public data-center fuel-cell deployment capacity. Yes Yes bloomenergy.com ↗
Equinix SV3 San Jose — 4.9 MW Bloom fuel-cell deployment Equinix Bloom Energy 5 MW operational 2017-09-27Announced Confirmed site San Jose, CA solid oxide fuel cell Bloom/Equinix named-site confirmation plus EIA-860 support for 4.9 MW Bloom SOFC at Lundy Avenue. Yes Yes 1 bloomenergy.com ↗ Equinix SV3 is named in the 2017 Bloom/Equinix expansion and has EIA-860 support for 4.9 MW at the Lundy Avenue fuel-cell site. MLQ keeps the row as a confirmed Equinix data-center deployment.
Equinix LA3 El Segundo — 4 MW Bloom fuel-cell deployment Equinix Bloom Energy 4 MW operational 2017-09-27Announced Confirmed site El Segundo, CA solid oxide fuel cell EIA-backed site capacity at Douglas/Maple Avenue fuel-cell records. Yes Yes 1 bloomenergy.com ↗ Equinix LA3 El Segundo is a named Equinix IBX in the Bloom/Equinix fuel-cell deployment set. MLQ keeps the row as confirmed_site and uses site-level MW only where public reporting or EIA/operator data supports it.
Equinix SV1 San Jose — 2.4 MW Bloom fuel-cell deployment Equinix Bloom Energy 2 MW operational 2017-09-27Announced Confirmed site San Jose, CA solid oxide fuel cell EIA-backed site capacity at Great Oaks Boulevard. Yes Yes 1 bloomenergy.com ↗ Equinix SV1 San Jose is a named Equinix IBX in the Bloom/Equinix fuel-cell deployment set. MLQ keeps the row as confirmed_site and uses site-level MW only where public reporting or EIA/operator data supports it.
Equinix SV10 San Jose — 2.1 MW Bloom fuel-cell deployment Equinix Bloom Energy 2 MW operational 2017-09-27Announced Confirmed site San Jose, CA solid oxide fuel cell Bloom/Equinix named-site confirmation plus EIA-860 support for 2.1 MW Bloom SOFC at Great Oaks Boulevard. Yes Yes 1 bloomenergy.com ↗ Equinix SV10 is named in the 2017 Bloom/Equinix expansion and has EIA-860 support for 2.1 MW at the Great Oaks Boulevard fuel-cell site. MLQ keeps the row as a confirmed Equinix data-center deployment.
Equinix LA4 El Segundo — Bloom fuel-cell deployment Equinix Bloom Energy - operational 2017-09-27Announced Confirmed site El Segundo, CA solid oxide fuel cell Named site; per-site MW not public. Yes Yes 1 bloomenergy.com ↗ Equinix LA4 El Segundo is a named Equinix IBX in the Bloom/Equinix fuel-cell deployment set. MLQ keeps the row as confirmed_site and uses site-level MW only where public reporting or EIA/operator data supports it.
Equinix LA7 Los Angeles — Bloom fuel-cell deployment Equinix Bloom Energy - operational 2017-09-27Announced Confirmed site Los Angeles, CA solid oxide fuel cell Named site; per-site MW not public. Yes Yes 1 bloomenergy.com ↗ Equinix LA7 Los Angeles is a named Equinix IBX in the Bloom/Equinix fuel-cell deployment set. MLQ keeps the row as confirmed_site and uses site-level MW only where public reporting or EIA/operator data supports it.
Equinix SV6 San Jose — Bloom fuel-cell deployment Equinix Bloom Energy - operational 2017-09-27Announced Confirmed site San Jose, CA solid oxide fuel cell Named site in Bloom/Equinix 2017 expansion; per-site capacity not disclosed. Yes Yes 1 bloomenergy.com ↗ Equinix SV6 is named in Bloom Energy and Equinix's 2017 Silicon Valley fuel-cell expansion. MLQ keeps the row as confirmed_site and does not allocate MW because site-level capacity is not public.
Equinix SV2 San Jose — 5.2 MW Bloom fuel-cell deployment Equinix Bloom Energy 5 MW operational 2017-08-16Announced Confirmed site San Jose, CA solid oxide fuel cell Current Equinix page reports 5,200 kW Bloom fuel cells. Yes Yes 1 equinix.com ↗ Equinix SV2 San Jose is a named Equinix IBX in the Bloom/Equinix fuel-cell deployment set. MLQ keeps the row as confirmed_site and uses site-level MW only where public reporting or EIA/operator data supports it.
Equinix NY4 Secaucus — Bloom fuel-cell deployment Equinix Bloom Energy - operational 2017-08-16Announced Confirmed site Secaucus, NJ solid oxide fuel cell Named site; per-site MW not public. Yes Yes 1 bloomenergy.com ↗ Equinix NY4 Secaucus is a named Equinix IBX in the Bloom/Equinix fuel-cell deployment set. MLQ keeps the row as confirmed_site and uses site-level MW only where public reporting or EIA/operator data supports it.
Equinix NY2 Secaucus — Bloom fuel-cell deployment Equinix Bloom Energy - operational 2017-08-16Announced Confirmed site Secaucus, NJ solid oxide fuel cell Named site; per-site MW not public. Yes Yes 1 bloomenergy.com ↗ Equinix NY2 Secaucus is a named Equinix IBX in the Bloom/Equinix fuel-cell deployment set. MLQ keeps the row as confirmed_site and uses site-level MW only where public reporting or EIA/operator data supports it.
Equinix NY5 Secaucus — Bloom fuel-cell deployment Equinix Bloom Energy - operational 2017-08-16Announced Confirmed site Secaucus, NJ solid oxide fuel cell Named site; per-site MW not public; NJDEP permit linked. Yes Yes 1 1 bloomenergy.com ↗ Equinix NY5 Secaucus is a named Equinix IBX in the Bloom/Equinix fuel-cell deployment set. MLQ keeps the row as confirmed_site and uses site-level MW only where public reporting or EIA/operator data supports it.
Frontier New Haven Orange Street central office — 1.4 MW Bloom fuel cell Frontier Communications Bloom Energy 1 MW approved 2017-01-19Approved Confirmed filing New Haven, CT solid oxide fuel cell CT Siting Council petition supports 1.4 MW customer-side Bloom fuel-cell capacity. Yes Yes 1 1 portal.ct.gov ↗ Frontier New Haven Orange Street central office — 1.4 MW Bloom fuel cell is a CT Siting Council filing-backed Frontier Communications telecom central-office fuel-cell record. MLQ includes it under telecom/NOC infrastructure, not cloud or colocation.
Frontier Meriden Butler Street central office — 400 kW Bloom fuel cell Frontier Communications Bloom Energy 0 MW approved 2017-01-19Approved Confirmed filing Meriden, CT solid oxide fuel cell CT Siting Council petition supports 0.4 MW customer-side Bloom fuel-cell capacity. Yes Yes 1 1 portal.ct.gov ↗ Frontier Meriden Butler Street central office — 400 kW Bloom fuel cell is a CT Siting Council filing-backed Frontier Communications telecom central-office fuel-cell record. MLQ includes it under telecom/NOC infrastructure, not cloud or colocation.
Frontier Danbury West Street central office — 200 kW Bloom fuel cell Frontier Communications Bloom Energy 0 MW approved 2017-01-19Approved Confirmed filing Danbury, CT solid oxide fuel cell CT Siting Council petition supports 0.2 MW customer-side Bloom fuel-cell capacity. Yes Yes 1 1 portal.ct.gov ↗ Frontier Danbury West Street central office — 200 kW Bloom fuel cell is a CT Siting Council filing-backed Frontier Communications telecom central-office fuel-cell record. MLQ includes it under telecom/NOC infrastructure, not cloud or colocation.
Apple Park (Campus 2) Cupertino — Bloom Energy 4 MW non-DC Apple Inc Bloom Energy - non dc commercial campus 2017-01-01Operational Candidate Cupertino, CA solid oxide fuel cell 4 MW source capacity retained internally; not counted in public data-center fuel-cell deployment capacity. Yes Yes datacenterdynamics.com ↗ Apple Park (Campus 2) Cupertino CA 4 MW Bloom Energy microgrid installation. 75% Campus 2 power coverage during work hours. Operational ~2017.
Constellation + Bloom Energy 40 MW commercial and public sector projects (CA + CT + NJ + NY) non-DC Multiple commercial and public sector customers (sites not publicly disclosed) Bloom Energy - non dc specific portfolio 2017-01-01Announced Candidate - solid oxide fuel cell 40 MW source capacity retained internally; not counted in public data-center fuel-cell deployment capacity. Yes No bloomenergy.com ↗ Constellation + Bloom 40 MW portfolio across CA + CT + NJ + NY commercial/public sector, ~2017 sequel to 2014 deal.
Equinix SV4 San Jose — 4.8 MW Bloom fuel-cell deployment Equinix Bloom Energy 5 MW operational 2017-01-01Operating since Confirmed site San Jose, CA solid oxide fuel cell Current Equinix page and EIA-860 support 4.8 MW Bloom fuel cells. Yes Yes 1 equinix.com ↗ Equinix SV4 San Jose is a named Equinix IBX in the Bloom/Equinix fuel-cell deployment set. MLQ keeps the row as confirmed_site and uses site-level MW only where public reporting or EIA/operator data supports it.
AT&T Jericho central office — 1 MW Bloom fuel cell AT&T Bloom Energy 1 MW operational 2017-01-01Operating since Confirmed filing Jericho, NY solid oxide fuel cell EIA-860 supports 1 MW Bloom fuel-cell capacity for this AT&T site. Yes 1 1 eia.gov ↗ EIA-860 records AT&T Jericho central office — 1 MW Bloom fuel cell. MLQ includes it under the telecom central-office/network-infrastructure rule and links a facility record.
AT&T Kelvin central office — 1 MW Bloom fuel cell AT&T Bloom Energy 1 MW operational 2017-01-01Operating since Confirmed filing CA solid oxide fuel cell EIA-860 supports 1 MW Bloom fuel-cell capacity for this AT&T site. Yes Yes 1 1 eia.gov ↗ EIA-860 records AT&T Kelvin central office — 1 MW Bloom fuel cell. MLQ includes it under the telecom central-office/network-infrastructure rule and links a facility record.
AT&T Van Nuys central office — 1 MW Bloom fuel cell AT&T Bloom Energy 1 MW operational 2017-01-01Operating since Confirmed filing Van Nuys, CA solid oxide fuel cell EIA-860 supports 1 MW Bloom fuel-cell capacity for this AT&T site. Yes Yes 1 1 eia.gov ↗ EIA-860 records AT&T Van Nuys central office — 1 MW Bloom fuel cell. MLQ includes it under the telecom central-office/network-infrastructure rule and links a facility record.
Morgan Stanley Global HQ — 1585 Broadway NYC (Bloom 750 kW highrise install) non-DC Morgan Stanley Bloom Energy - non dc commercial building 2016-12-13Operating since Candidate New York, NY solid oxide fuel cell 0.75 MW source capacity retained internally; not counted in public data-center fuel-cell deployment capacity. Yes Yes bloomenergy.com ↗
Frontier Norwalk Washington Street central office — 400 kW Bloom fuel cell Frontier Communications Bloom Energy 0 MW approved 2016-12-08Approved Confirmed filing Norwalk, CT solid oxide fuel cell CT Siting Council petition supports 0.4 MW customer-side Bloom fuel-cell capacity. Yes Yes 1 1 portal.ct.gov ↗ Frontier Norwalk Washington Street central office — 400 kW Bloom fuel cell is a CT Siting Council filing-backed Frontier Communications telecom central-office fuel-cell record. MLQ includes it under telecom/NOC infrastructure, not cloud or colocation.
SGIP Anaheim telecom Bloom installation — 1.31 MW Undisclosed telecom customer Bloom Energy 1 MW operational 2016-11-15Operating since Confirmed filing Anaheim, CA solid oxide fuel cell CPUC SGIP record SCG-SGIP-2016-0247 supports 1,312.5 kW Bloom Energy Server capacity, NAICS 517911, payment completed, interconnection date 2016-11-15. Yes No 1 selfgenca.com ↗ CPUC SGIP record SCG-SGIP-2016-0247 is a 1.3125 MW Bloom Energy Server installation in Anaheim with NAICS 517911 telecom classification. SGIP masks the host customer and exact address, so MLQ keeps the row as filing-backed telecom infrastructure without a facility link.
SGIP Los Angeles telecom Bloom installation — 1.05 MW Undisclosed telecom customer Bloom Energy 1 MW operational 2016-10-06Operating since Confirmed filing Los Angeles, CA solid oxide fuel cell CPUC SGIP record SCG-SGIP-2015-0218 supports 1,050 kW Bloom Energy Server capacity, NAICS 517110, payment completed, interconnection date 2016-10-06. Yes No 1 selfgenca.com ↗ CPUC SGIP record SCG-SGIP-2015-0218 is a 1.05 MW Bloom Energy Server installation in Los Angeles with NAICS 517110 telecom classification. SGIP masks the host customer and exact address, so MLQ keeps the row as filing-backed telecom infrastructure without a facility link.
SGIP North Hollywood telecom Bloom installation — 210 kW Undisclosed telecom customer Bloom Energy 0 MW operational 2016-09-30Operating since Confirmed filing North Hollywood, CA solid oxide fuel cell CPUC SGIP record SCG-SGIP-2016-0246 supports 210 kW Bloom Energy Server capacity, NAICS 517911, payment completed, interconnection date 2016-09-30. Yes No 1 selfgenca.com ↗ CPUC SGIP record SCG-SGIP-2016-0246 is a 210 kW Bloom Energy Server installation in North Hollywood with NAICS 517911 telecom classification. SGIP masks the host customer and exact address, so MLQ keeps the row as filing-backed telecom infrastructure without a facility link.
AT&T Holger central office — 1.3 MW Bloom fuel cell AT&T Bloom Energy 1 MW operational 2016-01-01Operating since Confirmed filing Santa Clara, CA solid oxide fuel cell EIA-860 federal generator inventory supports 1.3 MW Bloom fuel-cell capacity at AT&T Holger, operating year 2016. Yes Yes 1 1 eia.gov ↗ EIA-860 records a 1.3 MW Bloom fuel-cell generator at AT&T Holger in Santa Clara County. MLQ includes it under the telecom central-office/network-infrastructure rule and links a facility record.
AT&T Hawthorne central office — 1 MW Bloom fuel cell AT&T Bloom Energy 1 MW operational 2016-01-01Operating since Confirmed filing Hawthorne, CA solid oxide fuel cell EIA-860 federal generator inventory supports 1.0 MW Bloom fuel-cell capacity at AT&T Hawthorne, operating year 2016. Yes Yes 1 1 eia.gov ↗ EIA-860 records a 1 MW Bloom fuel-cell generator at AT&T Hawthorne. MLQ includes it under the telecom central-office/network-infrastructure rule and links a facility record.
DirecTV Los Angeles operations center — 1 MW Bloom fuel cell DirecTV Bloom Energy 1 MW operational 2016-01-01Operating since Confirmed filing Los Angeles, CA solid oxide fuel cell EIA-860 federal generator inventory supports 1.0 MW Bloom fuel-cell capacity at DirecTV Los Angeles, operating year 2016. Yes Yes 1 1 eia.gov ↗ EIA-860 records a 1 MW Bloom fuel-cell generator at DirecTV Los Angeles. MLQ includes it as media/broadcast operations infrastructure adjacent to telecom/data-center workloads, not as hyperscale cloud or colocation.
SGIP San Jose telecom Bloom installation — 1.05 MW Undisclosed telecom customer Bloom Energy 1 MW operational 2015-11-09Operating since Confirmed filing San Jose, CA solid oxide fuel cell CPUC SGIP record PGE-SGIP-2015-2871 supports 1,050 kW Bloom Energy Server capacity, NAICS 517919, payment completed, interconnection date 2015-11-09. Yes No 1 selfgenca.com ↗ CPUC SGIP record PGE-SGIP-2015-2871 is a 1.05 MW Bloom Energy Server installation in San Jose with NAICS 517919 telecom classification. SGIP masks the host customer and exact address, so MLQ keeps the row as filing-backed telecom infrastructure without a facility link.
SGIP San Diego telecom Bloom installation — 1.05 MW Undisclosed telecom/data-processing customer Bloom Energy 1 MW operational 2015-03-16Operating since Confirmed filing San Diego, CA solid oxide fuel cell CPUC SGIP record SD-SGIP-2013-0552 supports 1,050 kW Bloom Energy Server capacity, NAICS 517919, filed 2013-12-11, interconnection date 2015-03-16. Yes No 1 selfgenca.com ↗ CPUC SGIP record SD-SGIP-2013-0552 is a 1.05 MW Bloom Energy Server installation in San Diego with NAICS 517919 telecom classification. SGIP masks the host customer and exact address, so MLQ keeps the row as filing-backed infrastructure without a facility link.
Stanford University Campus — Bloom Energy 4.2 MW Microgrid non-DC Stanford University Bloom Energy - non dc campus energy 2015-01-01Announced Candidate Stanford, CA solid oxide fuel cell 4.2 MW campus microgrid retained internally; not counted in public data-center fuel-cell deployment capacity. Yes Yes sesi.stanford.edu ↗ Stanford University 4.2 MW Bloom Energy microgrid, deployed 2015. 30% campus carbon emission reduction. Sibling deployment to Caltech 4.2 MW (academic-institution Bloom pattern).
Equinix SV5 San Jose — Bloom fuel-cell deployment Equinix Bloom Energy 1 MW operational 2015-01-01Announced Confirmed site San Jose, CA solid oxide fuel cell EIA-860 supports 1.1 MW Bloom SOFC at Equinix SV5 operating year 2015; current Equinix page lists 5,000 kW Bloom fuel cells. Yes 1 equinix.com ↗ Equinix SV5 is the original Bloom/Equinix Silicon Valley pilot site and remains listed by Equinix with Bloom fuel cells. MLQ keeps the EIA-backed 1.1 MW operating capacity and notes the current facility-page 5,000 kW attribute separately.
Microsoft Cheyenne Data Plant — 300 kW FCEL biogas fuel cell Microsoft FuelCell Energy 0 MW operational 2014-11-07Operational Confirmed site Cheyenne, WY molten carbonate fuel cell (FCEL DFC platform, biogas-fueled) Microsoft source supports a 300 kW FCEL biogas fuel cell powering a 200 kW ITPAC data center, with surplus power returned to the wastewater plant. Yes Yes 1 blogs.microsoft.com ↗ Microsoft Cheyenne Data Plant was a historical data-center fuel-cell pilot: a 200 kW ITPAC containerized data center powered by a 300 kW FuelCell Energy molten-carbonate fuel cell using biogas from the Dry Creek wastewater facility. MLQ keeps it public as a confirmed data-center fuel-cell demonstration.
SGIP San Diego telecom Bloom installation — 420 kW Undisclosed telecom/data-processing customer Bloom Energy 0 MW operational 2014-10-13Operating since Confirmed filing San Diego, CA solid oxide fuel cell CPUC SGIP record SD-SGIP-2013-0551 supports 420 kW Bloom Energy Server capacity, NAICS 517919, filed 2013-12-11, interconnection date 2014-10-13. Yes No 1 selfgenca.com ↗ CPUC SGIP record SD-SGIP-2013-0551 is a 0.42 MW Bloom Energy Server installation in San Diego with NAICS 517919 telecom classification. SGIP masks the host customer and exact address, so MLQ keeps the row as filing-backed infrastructure without a facility link.
Morgan Stanley Purchase data center — 263 kW Bloom fuel cell Morgan Stanley Bloom Energy 0 MW operational 2014-09-01Reporting start Confirmed filing Purchase, NY solid oxide fuel cell NYSERDA DER Facility ID 205 supports 262.5 kW Bloom Energy fuel-cell capacity with reporting start date 2014-09-01. Yes Yes 1 1 der.nyserda.ny.gov ↗ NYSERDA DER Facility 205 records a 262.5 kW Bloom Energy fuel-cell installation at Morgan Stanley Purchase. MLQ keeps it public as financial-sector enterprise data-center infrastructure.
Exelon + Bloom Energy 21 MW Bloom Energy Servers across 75 commercial sites (CA + CT + NJ + NY) non-DC Multiple commercial customers including AT&T (9 sites), other 66 sites not publicly disclosed Bloom Energy - non dc specific portfolio 2014-07-01Announced Candidate - solid oxide fuel cell 21 MW source capacity retained internally; not counted in public data-center fuel-cell deployment capacity. Yes No bloomenergy.com ↗ Exelon + Bloom 21 MW / 75 sites portfolio across CA + CT + NJ + NY, July 2014 financing announcement.
SGIP Sunnyvale information-services Bloom installation — 1.05 MW Undisclosed telecom/data-processing customer Bloom Energy 1 MW operational 2014-07-01Operating since Confirmed filing Sunnyvale, CA solid oxide fuel cell CPUC SGIP record PGE-SGIP-2013-2504 supports 1,050 kW Bloom Energy Server capacity, NAICS 518111, filed 2013-10-25, interconnection date 2014-07-01. Yes No 1 selfgenca.com ↗ CPUC SGIP record PGE-SGIP-2013-2504 is a 1.05 MW Bloom Energy Server installation in Sunnyvale with NAICS 518111 information services classification. SGIP masks the host customer and exact address, so MLQ keeps the row as filing-backed infrastructure without a facility link.
SGIP Fairfield data-processing Bloom installation — 1.05 MW Undisclosed telecom/data-processing customer Bloom Energy 1 MW operational 2014-03-06Operating since Confirmed filing Fairfield, CA solid oxide fuel cell CPUC SGIP record PGE-SGIP-2013-2480 supports 1,050 kW Bloom Energy Server capacity, NAICS 518210, filed 2013-06-25, interconnection date 2014-03-06. Yes No 1 selfgenca.com ↗ CPUC SGIP record PGE-SGIP-2013-2480 is a 1.05 MW Bloom Energy Server installation in Fairfield with NAICS 518210 data processing classification. SGIP masks the host customer and exact address, so MLQ keeps the row as filing-backed infrastructure without a facility link.
Comcast Berlin New Park Drive network facility — 400 kW Bloom fuel cell Comcast Bloom Energy 0 MW operational 2014-02-20Approved Confirmed filing Berlin, CT solid oxide fuel cell CT Siting Council Petition 1093 supports 400 kW Bloom customer-side fuel-cell capacity at Comcast Berlin, with constructed status update. Yes Yes 1 1 portal.ct.gov ↗ Connecticut Siting Council Petition 1093 supports a 400 kW Bloom Energy fuel cell at Comcast Berlin New Park Drive. MLQ includes it under telecom/network infrastructure and links a facility record.
Diamond State Brookside DE — Bloom Energy 3 MW Quantum Fuel Cell Project non-DC Diamond State Generation Partners / SP Diamond State Class B Holdings (Southern Power Co subsidiary post-June 2019) Bloom Energy - non dc grid generation 2014-01-01commercial_operation Candidate Newark, DE solid oxide fuel cell (Bloom Box configuration) 3 MW source capacity retained internally; not counted in public data-center fuel-cell deployment capacity. No Yes depsc.delaware.gov ↗
Diamond State Red Lion DE — Bloom Energy 27 MW Quantum Fuel Cell Project (130 Bloom Boxes) non-DC Diamond State Generation Partners / SP Diamond State Class B Holdings (Southern Power Co subsidiary post-June 2019) Bloom Energy - non dc grid generation 2014-01-01commercial_operation Candidate New Castle, DE solid oxide fuel cell (Bloom Box configuration) 27 MW source capacity retained internally; not counted in public data-center fuel-cell deployment capacity. No Yes depsc.delaware.gov ↗
Stop & Shop Mt Vernon NY — Bloom Energy (precursor pilot since 2014) non-DC Stop & Shop Supermarket Company (Ahold Delhaize) Bloom Energy - non dc retail site 2014-01-01Operational Candidate Mt Vernon, NY solid oxide fuel cell Source capacity retained internally; not counted in public data-center fuel-cell deployment capacity. Yes Yes bloomenergy.com ↗
Equinix NY13 Carteret — ClearEdge/Doosan fuel-cell deployment Equinix ClearEdge Power / Doosan Fuel Cell America - operational status unverified 2014-01-01Operational Confirmed site Carteret, NJ phosphoric acid fuel cell PureCell 400 nominal module size is 400 kW, but NY13 module count and current operating status are not public, so capacity remains null. Yes Yes 1 bloomenergy.com ↗ Equinix NY13 Carteret is a Verizon-legacy data-center fuel-cell site acquired by Equinix. MLQ corrected the supplier from Bloom to ClearEdge Power / Doosan Fuel Cell America. The row is kept public as a named data-center fuel-cell site, but capacity remains null because NY13 module count and current operating status are not public.
Verizon Jamaica central office — 800 kW ClearEdge/Doosan fuel cell Verizon ClearEdge Power / Doosan Fuel Cell America 1 MW operational 2013-12-31Reporting start Confirmed filing Jamaica, NY phosphoric acid fuel cell NYSERDA DER supports 0.8 MW ClearEdge/Doosan PureCell capacity with reporting start date in 2013. Yes Yes 1 1 der.nyserda.ny.gov ↗ NYSERDA DER records Verizon Jamaica central office — 800 kW ClearEdge/Doosan fuel cell. MLQ includes it under telecom central-office/NOC infrastructure and links a facility record.
Verizon Rockaway Ave central office — 400 kW ClearEdge/Doosan fuel cell Verizon ClearEdge Power / Doosan Fuel Cell America 0 MW operational 2013-12-31Reporting start Confirmed filing Brooklyn, NY phosphoric acid fuel cell NYSERDA DER supports 0.4 MW ClearEdge/Doosan PureCell capacity with reporting start date in 2013. Yes Yes 1 1 der.nyserda.ny.gov ↗ NYSERDA DER records Verizon Rockaway Ave central office — 400 kW ClearEdge/Doosan fuel cell. MLQ includes it under telecom central-office/NOC infrastructure and links a facility record.
Verizon Forest Ave central office — 400 kW ClearEdge/Doosan fuel cell Verizon ClearEdge Power / Doosan Fuel Cell America 0 MW operational 2013-12-31Reporting start Confirmed filing Staten Island, NY phosphoric acid fuel cell NYSERDA DER supports 0.4 MW ClearEdge/Doosan PureCell capacity with reporting start date in 2013. Yes Yes 1 1 der.nyserda.ny.gov ↗ NYSERDA DER records Verizon Forest Ave central office — 400 kW ClearEdge/Doosan fuel cell. MLQ includes it under telecom central-office/NOC infrastructure and links a facility record.
Verizon Meserole St central office — 800 kW ClearEdge/Doosan fuel cell Verizon ClearEdge Power / Doosan Fuel Cell America 1 MW operational 2013-12-30Reporting start Confirmed filing Brooklyn, NY phosphoric acid fuel cell NYSERDA DER supports 0.8 MW ClearEdge/Doosan PureCell capacity with reporting start date in 2013. Yes Yes 1 1 der.nyserda.ny.gov ↗ NYSERDA DER records Verizon Meserole St central office — 800 kW ClearEdge/Doosan fuel cell. MLQ includes it under telecom central-office/NOC infrastructure and links a facility record.
SGIP San Jose telecom Bloom installation — 525 kW Undisclosed telecom/data-processing customer Bloom Energy 1 MW operational 2013-12-30Operating since Confirmed filing San Jose, CA solid oxide fuel cell CPUC SGIP record PGE-SGIP-2013-2477 supports 525 kW Bloom Energy Server capacity, NAICS 517000, filed 2013-05-22, interconnection date 2013-12-30. Yes No 1 selfgenca.com ↗ CPUC SGIP record PGE-SGIP-2013-2477 is a 0.53 MW Bloom Energy Server installation in San Jose with NAICS 517000 telecom classification. SGIP masks the host customer and exact address, so MLQ keeps the row as filing-backed infrastructure without a facility link.
Verizon Clinton Ave central office — 400 kW ClearEdge/Doosan fuel cell Verizon ClearEdge Power / Doosan Fuel Cell America 0 MW operational 2013-12-30Reporting start Confirmed filing Brooklyn, NY PureCell Model 400 fuel cell NYSERDA DER Facility 176 reports a 400 kW PureCell Model 400 fuel-cell system with reporting start 2013-12-30. Yes Yes 1 1 der.nyserda.ny.gov ↗ NYSERDA DER Facility 176 identifies a Verizon Clinton Ave / Brooklyn telecom central-office fuel-cell installation using a 400 kW PureCell Model 400 system. MLQ includes it as telecom/network infrastructure relevant to the data-center power product, not as hyperscale cloud capacity.
SGIP San Francisco telecom Bloom installation — 525 kW Undisclosed telecom/data-processing customer Bloom Energy 1 MW operational 2013-12-19Operating since Confirmed filing San Francisco, CA solid oxide fuel cell CPUC SGIP record PGE-SGIP-2013-2476 supports 525 kW Bloom Energy Server capacity, NAICS 517000, filed 2013-05-22, interconnection date 2013-12-19. Yes No 1 selfgenca.com ↗ CPUC SGIP record PGE-SGIP-2013-2476 is a 0.53 MW Bloom Energy Server installation in San Francisco with NAICS 517000 telecom classification. SGIP masks the host customer and exact address, so MLQ keeps the row as filing-backed infrastructure without a facility link.
FCEL Bridgeport Fuel Cell Park — 14.9 MW (originally Dominion-owned, acquired by FCEL late 2023) non-DC FuelCell Energy Generation (grid-feed via 15-yr PPA, offtake initially Connecticut Light & Power) FuelCell Energy 15 MW non dc operational 2013-12-01commercial_operation Confirmed filing Bridgeport, CT molten carbonate fuel cell (SureSource 3000 ×5) + Organic Rankine Cycle turbine 14.9 MW operational since 2013. FCEL designed/built/operated. 5 SureSource 3000 systems + Organic Rankine Cycle (ORC) turbine for waste heat recovery. Brownfield reclaimed gravel site. Powers ~15,000 homes equivalent. 15-year PPA with Connecticut Light & Power. FCEL acquired 100% equity from Dominion Generation late 2023 for $35.4M cash; transaction added $15M+/yr to FCEL generation revenue. No Yes ctgreenbank.com ↗ Bridgeport Fuel Cell Park is a grid/utility fuel-cell generation asset, historically Dominion-owned and later acquired by FuelCell Energy. No data-center customer/site/operator tie is supported, so it is retained internally but excluded from the public data-center fuel-cell product.
AT&T New London central office — 400 kW Bloom fuel cell AT&T Bloom Energy / BE 2012 A LLC 0 MW operational 2013-10-31Approved Confirmed filing New London, CT solid oxide fuel cell CT Siting Council Petition 1068 lists a 400 kW customer-side fuel cell at AT&T New London with constructed status update. Yes Yes 1 1 portal.ct.gov ↗ CT Siting Council Petition 1068 supports a 400 kW Bloom customer-side fuel-cell installation for AT&T in New London. MLQ includes this as telecom/network infrastructure relevant to data-center power, not hyperscale cloud capacity.
JPMorgan Chase Morgan Christiana Data Center JPMorgan Chase Bloom Energy 0 MW operational 2013-10-16Announced Confirmed site Newark, DE Bloom Energy solid oxide fuel cell Delaware state announcement and DOE fuel-cell reports state JPMorgan Chase installed/planned a 500 kW Bloom Energy fuel-cell system at its Morgan Christiana / Newark, Delaware data center to support data-center power. Capacity remains 0.5 MW because the DOE-cited 12 MW multi-site expansion was not confirmed in EIA-860 2024 or DNREC facility search. Yes Yes 1 news.delaware.gov ↗ JPMorgan Chase's Morgan Christiana / Newark, Delaware data-center site is a confirmed historical Bloom Energy fuel-cell deployment. Delaware state and DOE fuel-cell reports support a 500 kW Bloom installation for data-center power; MLQ does not promote larger JPMorgan Delaware expansion claims without separate filings.
eBay South Jordan Project Quicksilver data center — 6 MW Bloom primary-power system eBay Bloom Energy 6 MW decommissioning 2013-09-01Operating since Confirmed site South Jordan, UT solid oxide fuel cell 30 Bloom Energy Servers at approximately 200 kW each, about 6 MW total, for eBay South Jordan Project Quicksilver. Utah DAQ March 2025 update documents removal of the Bloom Energy Servers from the equipment list. Yes Yes 1 1 daqpermitting.utah.gov ↗ eBay South Jordan Project Quicksilver was a named data-center Bloom Energy primary-power deployment, using 30 Bloom Energy Servers at about 6 MW total. MLQ keeps it public because it is a direct data-center fuel-cell case, while clearly marking that Utah DAQ records now show the Bloom equipment being removed/decommissioned.
AT&T / Frontier Waterbury central office — 400 kW Bloom fuel cell AT&T / Frontier Communications Bloom Energy / 2013B ESA Project Company 0 MW operational 2013-07-25Approved Confirmed filing Waterbury, CT solid oxide fuel cell CT Siting Council Petition 1070 lists a 400 kW customer-side fuel cell at the Waterbury telecom central-office facility with constructed status update. Yes Yes 1 1 portal.ct.gov ↗ CT Siting Council Petition 1070 supports a 400 kW Bloom customer-side fuel-cell installation for AT&T / Frontier Communications in Waterbury. MLQ includes this as telecom/network infrastructure relevant to data-center power, not hyperscale cloud capacity.
AT&T Meriden Deerfield central office — 300 kW Bloom fuel cell AT&T Bloom Energy / BE 2012 A LLC 0 MW operational 2013-07-25Approved Confirmed filing Meriden, CT solid oxide fuel cell CT Siting Council Petition 1069 lists a 300 kW customer-side fuel cell at the Meriden telecom central-office facility with constructed status update. Yes Yes 1 1 portal.ct.gov ↗ CT Siting Council Petition 1069 supports a 300 kW Bloom customer-side fuel-cell installation for AT&T in Meriden. MLQ includes this as telecom/network infrastructure relevant to data-center power, not hyperscale cloud capacity.
Verizon California Bloom portfolio — LA/SF call-switching + San Jose data center Verizon Communications Bloom Energy - operational 2013-06-01Announced Confirmed portfolio Multiple: Los Angeles, San Francisco, San Jose, CA solid oxide fuel cell Bloom Energy June 2013 announcement names three Verizon California facilities: Los Angeles call-switching center, San Francisco call-switching center, and San Jose data center. Aggregate annual output is disclosed (>16 GWh/year); site-level MW is not public. Yes Yes bloomenergy.com ↗ Bloom Energy announced a Verizon California portfolio covering two call-switching centers in Los Angeles and San Francisco plus one San Jose data center. MLQ keeps this as a confirmed non-additive portfolio row because the exact facility addresses and site-level MW are not public, and SGIP rows may overlap.
AT&T Bridgeport central office — 700 kW Bloom fuel cell AT&T Bloom Energy / 2012 ESA Project Company 1 MW operational 2013-01-24Approved Confirmed filing Bridgeport, CT solid oxide fuel cell CT Siting Council Petition 1050 lists a 700 kW customer-side fuel cell at the Bridgeport telecom central-office facility with constructed status update. Yes Yes 1 1 portal.ct.gov ↗ CT Siting Council Petition 1050 supports a 700 kW Bloom customer-side fuel-cell installation for AT&T in Bridgeport. MLQ includes this as telecom/network infrastructure relevant to data-center power, not hyperscale cloud capacity.
AT&T Cheshire central office — 600 kW Bloom fuel cell AT&T Bloom Energy / 2012 ESA Project Company 1 MW operational 2013-01-24Approved Confirmed filing Cheshire, CT solid oxide fuel cell CT Siting Council Petition 1047 lists a 600 kW customer-side fuel cell at the Cheshire telecom central-office facility with constructed status update. Yes Yes 1 1 portal.ct.gov ↗ CT Siting Council Petition 1047 supports a 600 kW Bloom customer-side fuel-cell installation for AT&T in Cheshire. MLQ includes this as telecom/network infrastructure relevant to data-center power, not hyperscale cloud capacity.
AT&T Gardena telecom facility — 1 MW Bloom fuel cell AT&T Bloom Energy 1 MW operational 2013-01-01Operating since Confirmed filing Gardena, CA solid oxide fuel cell EIA Form 860 2024 final federal generator inventory reports a 1.0 MW Bloom Energy fuel-cell generator at AT&T - Gardena, CA, operating since 2013. Yes Yes 1 1 eia.gov ↗ EIA-860 identifies a 1.0 MW Bloom Energy fuel-cell generator at AT&T - Gardena, CA, operating since 2013. MLQ treats it as telecom/network infrastructure relevant to the data-center power product, not hyperscale cloud capacity.
NSA Campus Fort Meade MD — Department of Defense Bloom Energy 1.6 MW non-DC U.S. Department of Defense / National Security Agency (NSA) Bloom Energy 2 MW non dc federal campus 2013-01-01Operational Confirmed filing Fort Meade, MD solid oxide fuel cell 1.6 MW Bloom Energy SOFC installation at NSA Campus, Fort Meade MD per Bloom Energy direct disclosure. Operational since 2013. Powers equivalent of 1,200 homes. Department of Defense energy security strategy implementation. Manufactured by Bloom Energy in US. Mission-critical reliability use case. Yes Yes bloomenergy.com ↗ Bloom disclosure supports a 1.6 MW fuel-cell installation at the NSA Campus / Fort Meade, but the public source does not identify a data center, telecom/NOC, HPC facility, or AI-infrastructure site. Retained internally as mission-critical federal fuel-cell context; excluded from the public DC product.
SGIP Rocklin data-processing Bloom installation — 630 kW Undisclosed telecom/data-processing customer Bloom Energy 1 MW operational 2012-11-29Operating since Confirmed filing Rocklin, CA solid oxide fuel cell CPUC SGIP record PGE-SGIP-2011-1961 supports 630 kW Bloom Energy Server capacity, NAICS 518210, filed 2011-11-16, interconnection date 2012-11-29. Yes No 1 selfgenca.com ↗ CPUC SGIP record PGE-SGIP-2011-1961 is a 0.63 MW Bloom Energy Server installation in Rocklin with NAICS 518210 data processing classification. SGIP masks the host customer and exact address, so MLQ keeps the row as filing-backed infrastructure without a facility link.
SGIP San Diego telecom Bloom installation — 1.05 MW Undisclosed telecom/data-processing customer Bloom Energy 1 MW operational 2012-07-09Operating since Confirmed filing San Diego, CA solid oxide fuel cell CPUC SGIP record SD-SGIP-2010-0405 supports 1,050 kW Bloom Energy Server capacity, NAICS 517919, filed 2010-12-30, interconnection date 2012-07-09. Yes No 1 selfgenca.com ↗ CPUC SGIP record SD-SGIP-2010-0405 is a 1.05 MW Bloom Energy Server installation in San Diego with NAICS 517919 telecom classification. SGIP masks the host customer and exact address, so MLQ keeps the row as filing-backed infrastructure without a facility link.
SGIP Corona telecom Bloom installation — 525 kW Undisclosed telecom/data-processing customer Bloom Energy 1 MW operational 2012-04-10Operating since Confirmed filing Corona, CA solid oxide fuel cell CPUC SGIP record SCE-SGIP-2010-0044 supports 525 kW Bloom Energy Server capacity, NAICS 517210, filed 2011-02-16, interconnection date 2012-04-10. Yes No 1 selfgenca.com ↗ CPUC SGIP record SCE-SGIP-2010-0044 is a 0.53 MW Bloom Energy Server installation in Corona with NAICS 517210 telecom classification. SGIP masks the host customer and exact address, so MLQ keeps the row as filing-backed infrastructure without a facility link.
SGIP Fontana telecom Bloom installation — 315 kW Undisclosed telecom/data-processing customer Bloom Energy 0 MW operational 2012-04-10Operating since Confirmed filing Fontana, CA solid oxide fuel cell CPUC SGIP record SCE-SGIP-2010-0046 supports 315 kW Bloom Energy Server capacity, NAICS 517210, filed 2011-02-16, interconnection date 2012-04-10. Yes No 1 selfgenca.com ↗ CPUC SGIP record SCE-SGIP-2010-0046 is a 0.32 MW Bloom Energy Server installation in Fontana with NAICS 517210 telecom classification. SGIP masks the host customer and exact address, so MLQ keeps the row as filing-backed infrastructure without a facility link.
Apple Maiden, NC data center — 10 MW biogas Bloom fuel cells Apple Bloom Energy 10 MW operational 2012-04-01Operating since Confirmed site Maiden, NC solid oxide fuel cell Apple environmental disclosures support 10 MW of Bloom fuel-cell capacity at Maiden. The original installation was 4 MW in 2012 and later expanded to 10 MW; the fuel cells are supplied through a directed-biogas arrangement alongside solar and other clean-energy purchases. Yes Yes 1 1 apple.com ↗ Apple's Maiden, North Carolina data center has a confirmed Bloom Energy solid-oxide fuel-cell installation supplied through a directed-biogas arrangement. MLQ treats the row as an operational, operator-confirmed site deployment. The linked NC DEQ air permit and Apple data-center record support the facility context; the 2025 Apple expansion announcement is context for the campus, not a new fuel-cell commissioning date.
SGIP Rialto telecom Bloom installation — 315 kW Undisclosed telecom/data-processing customer Bloom Energy 0 MW operational 2012-03-29Operating since Confirmed filing Rialto, CA solid oxide fuel cell CPUC SGIP record SCE-SGIP-2010-0045 supports 315 kW Bloom Energy Server capacity, NAICS 517210, filed 2011-02-16, interconnection date 2012-03-29. Yes No 1 selfgenca.com ↗ CPUC SGIP record SCE-SGIP-2010-0045 is a 0.32 MW Bloom Energy Server installation in Rialto with NAICS 517210 telecom classification. SGIP masks the host customer and exact address, so MLQ keeps the row as filing-backed infrastructure without a facility link.
SGIP San Bernardino telecom Bloom installation — 840 kW Undisclosed telecom/data-processing customer Bloom Energy 1 MW operational 2012-03-28Operating since Confirmed filing San Bernardino, CA solid oxide fuel cell CPUC SGIP record SCE-SGIP-2010-0047 supports 840 kW Bloom Energy Server capacity, NAICS 517210, filed 2011-02-16, interconnection date 2012-03-28. Yes No 1 selfgenca.com ↗ CPUC SGIP record SCE-SGIP-2010-0047 is a 0.84 MW Bloom Energy Server installation in San Bernardino with NAICS 517210 telecom classification. SGIP masks the host customer and exact address, so MLQ keeps the row as filing-backed infrastructure without a facility link.
SGIP Redwood City telecom Bloom installation — 1.05 MW Undisclosed telecom/data-processing customer Bloom Energy 1 MW operational 2012-03-27Operating since Confirmed filing Redwood City, CA solid oxide fuel cell CPUC SGIP record PGE-SGIP-2010-1935 supports 1,050 kW Bloom Energy Server capacity, NAICS 517000, filed 2010-12-30, interconnection date 2012-03-27. Yes No 1 selfgenca.com ↗ CPUC SGIP record PGE-SGIP-2010-1935 is a 1.05 MW Bloom Energy Server installation in Redwood City with NAICS 517000 telecom classification. SGIP masks the host customer and exact address, so MLQ keeps the row as filing-backed infrastructure without a facility link.
SGIP San Jose telecom Bloom installation — 630 kW Undisclosed telecom/data-processing customer Bloom Energy 1 MW operational 2012-02-01Operating since Confirmed filing San Jose, CA solid oxide fuel cell CPUC SGIP record PGE-SGIP-2010-1933 supports 630 kW Bloom Energy Server capacity, NAICS 517000, filed 2010-12-30, interconnection date 2012-02-01. Yes No 1 selfgenca.com ↗ CPUC SGIP record PGE-SGIP-2010-1933 is a 0.63 MW Bloom Energy Server installation in San Jose with NAICS 517000 telecom classification. SGIP masks the host customer and exact address, so MLQ keeps the row as filing-backed infrastructure without a facility link.
SGIP San Jose telecom Bloom installation — 420 kW Undisclosed telecom/data-processing customer Bloom Energy 0 MW operational 2012-01-12Operating since Confirmed filing San Jose, CA solid oxide fuel cell CPUC SGIP record PGE-SGIP-2010-1932 supports 420 kW Bloom Energy Server capacity, NAICS 517000, filed 2010-12-30, interconnection date 2012-01-12. Yes No 1 selfgenca.com ↗ CPUC SGIP record PGE-SGIP-2010-1932 is a 0.42 MW Bloom Energy Server installation in San Jose with NAICS 517000 telecom classification. SGIP masks the host customer and exact address, so MLQ keeps the row as filing-backed infrastructure without a facility link.
SGIP El Cajon telecom Bloom installation — 600 kW Undisclosed telecom/data-processing customer Bloom Energy 1 MW operational 2011-12-15Operating since Confirmed filing El Cajon, CA solid oxide fuel cell CPUC SGIP record SD-SGIP-2010-0399 supports 600 kW Bloom Energy Server capacity, NAICS 517110, filed 2010-09-08, interconnection date 2011-12-15. Yes No 1 selfgenca.com ↗ CPUC SGIP record SD-SGIP-2010-0399 is a 0.60 MW Bloom Energy Server installation in El Cajon with NAICS 517110 telecom classification. SGIP masks the host customer and exact address, so MLQ keeps the row as filing-backed infrastructure without a facility link.
SGIP San Diego telecom Bloom installation — 400 kW Undisclosed telecom/data-processing customer Bloom Energy 0 MW operational 2011-12-15Operating since Confirmed filing San Diego, CA solid oxide fuel cell CPUC SGIP record SD-SGIP-2010-0398 supports 400 kW Bloom Energy Server capacity, NAICS 517110, filed 2010-09-08, interconnection date 2011-12-15. Yes No 1 selfgenca.com ↗ CPUC SGIP record SD-SGIP-2010-0398 is a 0.40 MW Bloom Energy Server installation in San Diego with NAICS 517110 telecom classification. SGIP masks the host customer and exact address, so MLQ keeps the row as filing-backed infrastructure without a facility link.
SGIP San Jose data-processing Bloom installation — 500 kW Undisclosed telecom/data-processing customer Bloom Energy 0 MW operational 2011-07-19Operating since Confirmed filing San Jose, CA solid oxide fuel cell CPUC SGIP record PGE-SGIP-2011-1950 supports 500 kW Bloom Energy Server capacity, NAICS 518210, filed 2011-11-15, interconnection date 2011-07-19. Yes No 1 selfgenca.com ↗ CPUC SGIP record PGE-SGIP-2011-1950 is a 0.50 MW Bloom Energy Server installation in San Jose with NAICS 518210 data processing classification. SGIP masks the host customer and exact address, so MLQ keeps the row as filing-backed infrastructure without a facility link.
Adobe Systems San Jose HQ — Bloom Energy 1.2 MW (12 Energy Servers) non-DC Adobe Systems Incorporated Bloom Energy 1 MW non dc corporate hq 2010-09-28Operational Confirmed filing San Jose, CA solid oxide fuel cell 12 Bloom Energy Servers at ~100 kW each = 1.2 MW per Bloom Energy press release Sept 28 2010 (largest commercial Bloom installation at the time of installation). Supplies approximately one-third of Adobe HQ electricity demand. Yes Yes bloomenergy.com ↗ Adobe San Jose HQ is a real historical Bloom Energy corporate-campus installation, but the source supports headquarters building power, not a data center, telecom/NOC, HPC, or AI-infrastructure deployment. Retained internally as Bloom market context and excluded from the public DC product.
Walmart California — Bloom Energy 30+ stores and distribution centers portfolio (biogas) non-DC Walmart Inc Bloom Energy - non dc retail distribution portfolio 2009-12-01first_installation Confirmed portfolio Multiple California (30+ stores incl. Lancaster), CA solid oxide fuel cell (biogas-fueled) Per Bloom Energy customer page: "Walmart installed its first Bloom Energy Server at its Lancaster, CA store in 2009, and today has more than 30 Bloom Energy installations at stores and distribution centers in California. Most of Walmart's clean energy servers from Bloom are powered by biogas." First Lancaster installation: ~800 kW (Jan 2010). 30+ CA stores total. **NOT a data center deployment but consistent with existing dataset scope** of capturing commercial Bloom installations beyond pure DCs (Morgan Stanley HQ, Cablevision NOC, Verizon central offices, One WTC, etc.). Site-level list NOT publicly disclosed by Walmart. Yes Yes bloomenergy.com ↗ Walmart California Bloom portfolio supports retail stores and distribution centers, not data-center/telecom/HPC infrastructure for the current public product.
SGIP San Jose data-processing Bloom installation — 500 kW Undisclosed telecom/data-processing customer Bloom Energy 0 MW operational 2009-07-02Operating since Confirmed filing San Jose, CA solid oxide fuel cell CPUC SGIP record PGE-SGIP-2010-1859 supports 500 kW Bloom Energy Server capacity, NAICS 518210, filed 2010-05-18, interconnection date 2009-07-02. Yes No 1 selfgenca.com ↗ CPUC SGIP record PGE-SGIP-2010-1859 is a 0.50 MW Bloom Energy Server installation in San Jose with NAICS 518210 data processing classification. SGIP masks the host customer and exact address, so MLQ keeps the row as filing-backed infrastructure without a facility link.
SGIP Mountain View data-processing Bloom installation — 400 kW Undisclosed telecom/data-processing customer Bloom Energy 0 MW operational 2009-02-19Operating since Confirmed filing Mountain View, CA solid oxide fuel cell CPUC SGIP record PGE-SGIP-2007-1747 supports 400 kW Bloom Energy Server capacity, NAICS 518111, filed 2007-06-07, interconnection date 2009-02-19. Yes No 1 selfgenca.com ↗ CPUC SGIP record PGE-SGIP-2007-1747 is a 0.40 MW Bloom Energy Server installation in Mountain View with NAICS 518111 data processing classification. SGIP masks the host customer and exact address, so MLQ keeps the row as filing-backed infrastructure without a facility link.
Verizon Garden City central office — 1.4 MW fuel-cell system Verizon Unknown 1 MW operational 2002-08-23Filed Confirmed filing Garden City, NY fuel cell NY DEC Air State Facility Permit 1-2820-00669/00001 states Verizon planned seven 200 kW fuel cells for onsite generation at Verizon Communications Garden City; capacity = 1.4 MW. Supplier is not named. Yes Yes 1 1 extapps.dec.ny.gov ↗ NY DEC Air State Facility Permit 1-2820-00669/00001 supports seven 200 kW fuel cells at Verizon Communications Garden City for onsite generation. MLQ includes it as telecom/network infrastructure relevant to the data-center power product. The permit does not name the supplier, so this row is not attributed to Bloom.
AT&T Bloom Energy network portfolio — 21 MW across 34 sites AT&T Bloom Energy 21 MW operational Confirmed portfolio - solid oxide fuel cell Bloom Energy AT&T customer case study reports 21 MW of primary power across 34 AT&T network sites in CA, CT, NJ, and NY. Site-level decomposition is partial; this row is non-additive portfolio context. Yes Yes bloomenergy.com ↗ Bloom Energy reports 21 MW of primary power across 34 AT&T network sites in CA, CT, NJ, and NY. MLQ keeps this as a confirmed non-additive portfolio row because AT&T network sites include central offices/NOCs/data-center-adjacent infrastructure, while individual filing-backed rows carry site-level detail where public records identify them.
eBay San Jose HQ — Bloom Energy 500 kW non-DC eBay Inc Bloom Energy 0 MW non dc corporate hq Confirmed site San Jose, CA solid oxide fuel cell 500 kW Bloom fuel cell installation per multiple public sources (Bloom IR, MIT Technology Review, Waste Dive). Co-located with 650 kW solar array at eBay San Jose HQ. Distinct from the separate 6 MW Bloom installation at eBay South Jordan UT data center (Project Quicksilver, captured separately as `ebay-south-jordan-ut-project-quicksilver-bloom-30-boxes-6mw`). Yes Yes investor.bloomenergy.com ↗ eBay San Jose HQ is a corporate headquarters installation distinct from eBay South Jordan Project Quicksilver data center.
Aberdeen Proving Ground MD — U.S. Army hydrogen fuel cells (3 facilities, USACE + DOE) non-DC U.S. Army (USACE Engineer Research and Development Center) TBD (specific FC manufacturer not disclosed in primary source) - non dc federal facilities Confirmed filing Aberdeen, MD hydrogen fuel cell (PEM, backup power configuration) U.S. Army installing hydrogen fuel cells at 3 Aberdeen Proving Ground (APG) MD facilities per Army announcement Nov 14: (1) Building 325 — Building Operations Control Center [ribbon-cutting Nov 16 first to complete], (2) Edgewood Area snow removal center (Building E2194), (3) Aberdeen Test Center range control (Building E7010). USACE + DOE joint project, Nicholas Josefik (USACE ERDC) project manager. Specific FC MW per facility NOT disclosed. Use case = backup power (energy security, mission performance, alternative to combustion generators). Yes Yes army.mil ↗ Aberdeen Proving Ground hydrogen fuel cells support Army buildings / backup power, not a data-center/telecom/HPC deployment.
No deployments match these filters. Clear all to reset.
At a glance

Capacity & geography

Capacity stage
Operational vs forward, to scale
Operationalrunning today
260 MW
Approved + filedin regulatory pipeline
2.56 GW
Announcedpress / contract stage
4.15 GW
The running base is a sliver next to what has been announced.
Forward book
The megaprojects
Project JupiterAnnounced · NM
2.45 GW
Hedgehog Rice Power and Data CampuFiled · TX
1.50 GW
AEP / Bloom 1 GW AI data-center fuAnnounced · non-additive
1.00 GW
ECL TerraSite-TX1Announced · TX
1.00 GW
Project Jade Cheyenne AI FactoryApproved · WY
900 MW
Diversified Energy / FuelCell EnerAnnounced
360 MW
Nebius AI Factory Independence MOAnnounced · MO
328 MW
AWS Hilliard / Scioto Darby CreekApproved · OH
73 MW
Approved / filedAnnouncedNon-additive (MSA)
Geography
Top states by capacity
Texas3 rows
2.50 GW
New Mexico1 rows
2.45 GW
Wyoming3 rows
902 MW
Missouri1 rows
328 MW
California48 rows
76 MW
Ohio2 rows
73 MW
Virginia4 rows
60 MW
Connecticut14 rows
52 MW
New York14 rows
23 MW
Illinois1 rows
14 MW
Suppliers
Bloom dominance
Bloom Energy90 rows
5.55 GW
Other / undisclosed4 rows
1.06 GW
FuelCell Energy2 rows
360 MW
HyAxiom / Doosan6 rows
3 MW
Ballard / PowerCell2 rows
2 MW
Operational base
Install cadence by year
150
2010 · 0 sites
2011 · 3 sites
2012 · 10 sites
2013 · 15 sites
2014 · 6 sites
2015 · 3 sites
2016 · 6 sites
2017 · 15 sites
2018 · 2 sites
2019 · 2 sites
2020 · 2 sites
2021 · 8 sites
2022 · 3 sites
2023 · 1 site
20102013201720202023
Sites entering service per year, 2010–2023 (y-axis: sites; hover a bar for the count). The 2013 and 2017 SGIP peaks, then a flat tail.

How to read this data

Every row carries an evidence tier and a status code, so each claim traces back to the source that supports it. The keys below are what you need to read the table. The full methodology, the complete source list, and the field-by-field data dictionary live in the coverage memo.

Evidence tiers

confirmed_filing
Named in a primary government regulatory record — case number, site, capacity, vendor. Strongest tier.
confirmed_site
A credible primary source (operator page, supplier release, state incentive registry) names the specific site and supplier.
confirmed_portfolio
The aggregate is confirmed (total MW, total sites); individual sites not yet decomposed.
pipeline_lead
A deal, MSA, or procurement agreement exists, but no specific site-level deployment yet.

Status codes

operational
Online and producing power, confirmed via interconnection record or operator disclosure.
approved
Regulatory approval granted (siting / supply agreement), not yet commercially operating.
filed
Application filed with a regulator, pending a decision.
announced
Publicly announced customer + supplier; no formal filing or approval surfaced yet.
Full methodology, sources & data dictionary → coverage memo
The Power Delivery GapReport
Research

The Power Delivery Gap

The interconnection queue holds more than 1,100 GW of power. The grid delivers renewables quickly and firm gas slowly, if at all. A model of what the US grid can actually deliver, and when, built on MLQ's queue and generator data.

No spam. Unsubscribe anytime.